User Railway definition

User Railway means the Zonal Railway or Divisional Railway which has placed the contract on firm in terms of this agreement.

Examples of User Railway in a sentence

  • The vehicle normally shall be used by the Railway/kept with the Railway for 24 hours in a day and used as per the instruction of the User (Railway officer).

  • The User Railway shall issue the necessary identity card (even if temporary) to the working staff/service engineer for their entry on the platform and other railway premises.

  • User Railway shall verify application software pertaining to yard data.

  • User Railway shall verify application software pertaining to yard data as contained in the table of controls.NILcorrected.

  • Based upon this agreement, the contract shall be signed by the user loco shed at Zonal HQ and shall be executed under the overall supervision of Zonal Railway.The User Railway shall nominate an officer who shall operate the contract for maintenance of the equipment and who shall be responsible for making the contract (Liaison) with the firm The nominated Railway officer shall also be responsible for supervision of the contractor's works for the verification of contractor's bill for payment.

  • He was betting that the stormtroopers would use the main halls, which were larger and led to the grand staircases and turbolifts.

  • Format for performance Feed back  Name of System Equipment. Make Model/ Version No. User Railway / PSTN / Public Utility & section LocationNo. of system/ equipmentDate of CommissioningTotal hours in useNos.

  • User Railway shall nominate the Officer / Supervisors for supervision of the above activities i.e yearly , 3 yearly & 6 yearly schedules indicated above.

  • The vehicle, if required may go out of the nominated place and remain for days together as per the requirement of the User (Railway Officer).

  • The Multi-Residential Property Class The tax impact experience of the multi-residential property class is described in the frequency distribution graphs and tables listed in the Annex E series to this report.

Related to User Railway

  • Unfit-for-use tank system means a tank system that has been determined through an integrity assessment or other inspection to be no longer capable of storing or treating hazardous waste without posing a threat of release of hazardous waste to the environment.

  • Railway means the President of the Republic of India or the Administrative Officers of the Railway or Successor Railway authorized to deal with any matters, which these presents are concerned on his behalf.

  • Channel migration zone (CMZ) means the area where the active channel of a stream is prone to move and this results in a potential near-term loss of riparian function and associated habitat adjacent to the stream, except as modified by a permanent levee or dike. For this purpose, near-term means the time scale required to grow a mature forest. (See board manual section 2 for descriptions and illustrations of CMZs and delineation guidelines.)

  • Transit Traffic means traffic originating on CLEC’s network that is switched and transported by AT&T-TSP and delivered to a Third Party Terminating Carrier’s network or traffic from a Third Party Originating Carrier’s network. A call that is originated or terminated by a CLEC purchasing local switching pursuant to a commercial agreement with AT&T-TSP is not considered Transit Traffic for the purposes of this Attachment. Additionally Transit Traffic does not include traffic to/from IXCs.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • multi-system operator or “MSO” means a cable operator who has been granted registration under rule 11 of the Cable Television Networks Rules, 1994 and who receives a programming service from a broadcaster and re-transmits the same or transmits his own programming service for simultaneous reception either by multiple subscribers directly or through one or more local cable operators;

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • small and medium-sized enterprises or ‘SMEs’ means small and medium-sized enterprises as defined in Article 2 of the Annex to Commission Recommendation 2003/361/EC;

  • distribution system operator means a natural or legal person responsible for operating, ensuring the maintenance of and, if necessary, developing the distribution system in a given area and, where applicable, its interconnections with other systems and for ensuring the long-term ability of the system to meet reasonable demands for the distribution of electricity;

  • Leak-detection system means a system capable of detecting the failure of either the primary or secondary containment structure or the presence of a release of hazardous waste or accumulated liquid in the secondary containment structure. Such a system must employ operational controls (e.g., daily visual inspections for releases into the secondary containment system of aboveground tanks) or consist of an interstitial monitoring device designed to detect continuously and automatically the failure of the primary or secondary containment structure or the presence of a release of hazardous waste into the secondary containment structure.

  • Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.

  • Small Business Enterprise (SBE) means a business that is certified as an SBE under this program or the following similar programs and meeting the below economic thresholds (Section III “Economic Size Standards”).

  • Transmission System Operator means a natural or legal person responsible for operating, ensuring the maintenance of and, if necessary, developing the transmission system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the transmission of electricity;

  • Cabinet x-ray system means an x-ray system with the x-ray tube installed in an enclosure independent of existing architectural structures except the floor on which it may be placed. The cabinet x-ray system is intended to contain at least that portion of a material being irradiated, provide radiation attenuation, and exclude personnel from its interior during generation of radiation. Included are all x-ray systems designed primarily for the inspection of carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An x-ray tube used within a shielded part of a building, or x-ray equipment that may temporarily or occasionally incorporate portable shielding, is not considered a cabinet x-ray system.

  • National Pollutant Discharge Elimination System means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements under Sections 307, 402, 318, and 405 of the Clean Water Act.

  • Customer Usage Data means the Telecommunications Services usage data of a CLEC End User measured in minutes, sub-minute increments, message units, or otherwise, that is recorded by SBC-13STATE and forwarded to CLEC.

  • Subloop shall have the meaning set forth in Section 9.3.1.1.

  • Certified cabinet x-ray system means an x-ray system that has been certified in accordance with 21 CFR 1010.2 as being manufactured and assembled pursuant to the provisions of 21 CFR 1020.40.

  • Energy storage system means a system which stores energy and releases it in the same form as was input.

  • Railway Corridor means, prior to the grant of a Special Railway Licence, the land for the route of the Railway the subject of that licence, access roads (other than Lateral Access Roads), areas from which stone, sand, clay and gravel may be taken, temporary accommodation facilities for the railway workforce, water bores and Additional Infrastructure (if any) which is the subject of a subsisting agreement pursuant to subclause (3)(a) and after the grant of the Special Railway Licence the land from time to time the subject of that Special Railway Licence;