User Requirements definition
Examples of User Requirements in a sentence
COPV requirements prompting the DDC are levied in AIAA-S-O81 Space Systems – Composite Overwrapped Pressure Vessels (COPVs), KNPR 8715.3 ▇▇▇▇▇▇▇ NASA Procedural Requirements and AFSPACEMAN 91-710 Range Safety User Requirements Manual Volume 3 –Launch Vehicles, Payloads, and Ground Support Systems.
The scope of software development, constituent modules, functions of each module, specifications, versions, value and inspection standards of this Contract shall be based on the contents listed in the attached User Requirements Specification Product Prototype.
The User Requirements as of the date of this Agreement and as modified from time-to-time by the Company are set forth on the respective schedule posted on the Company’s website.
These evaluation activities have enabled us to objectively measure PATHS to assess accuracy, reliability and scalability Finally, results of the Field Trials, coupled with those reported in D5.1 and D5.2, have enabled us to confirm that the PATHS prototype does meet user requirements as identified in D1.1 User Requirements Analysis (2011).
For clients required to comply with FDA 21CFR Part 11, DocXellent provides services to establish proper requirements, installation and functionality qualification documentation and evidence inclusive of a User Requirements Specification, Traceability Matrix, Installation Qualification (IQ), Operational Qualification (OQ) and Performance Qualification (PQ) as well as Deviation and Validation Summary Reports.
The User Requirements and Technical Specification compiled by the CFOA Respiratory Equipment Group form the basis of the specification for these goods and services.
Case study VI will test at least 4 repository features that express several requirements outlined in D4.1 (see Appendix A – 4.1 User Requirements Allocated to Case Studies for more details).
This case study will be conducted during the first phase of the development connected to a specific set of requirements features; see section Appendix A – 4.1 User Requirements and Platform Specifications for further details.
Before the completion of the User Requirements Review (UR/R), a Software Project Management Plan outlining the whole project must be produced by the developer.
Specific user requirements must be identified and documented in the User Requirements Document (URD).