Variable Resource Requirement Curve definition

Variable Resource Requirement Curve means a series of maximum prices that can be cleared in a Base Residual Auction for Unforced Capacity, corresponding to a series of varying resource requirements based on varying installed reserve margins, as determined by the Office of the Interconnection for the PJM Region and for certain Locational Deliverability Areas in accordance with the methodology provided in Tariff, Attachment DD, section 5.
Variable Resource Requirement Curve means a series of maximum prices that can be cleared in a Base Residual Auction for Unforced Capacity, corresponding to a series of varying resource requirements based on varying installed reserve margins, as determined by the Office of the Interconnection for the PJM Region and for certain Locational Deliverability Areas in accordance with the methodology provided in Section 5. Virtual Credit Exposure is the amount of potential credit exposure created by a market participant’s bid submitted into the Day-ahead market, as defined in this policy.
Variable Resource Requirement Curve means a series of maximum prices that

Examples of Variable Resource Requirement Curve in a sentence

  • Where the supply curve consists only of Sell Offers located entirely below the Variable Resource Requirement Curve and Sell Offers located entirely above the Variable Resource Requirement Curve, the auction shall clear at the price-capacity point on the Variable Resource Requirement Curve corresponding to the total Unforced Capacity provided by all Sell Offers located entirely below the Variable Resource Requirement Curve.

  • Where the supply curve formed by the Sell Offers submitted in an auction falls entirely below the Variable Resource Requirement Curve, the auction shall clear at the price-capacity point on the Variable Resource Requirement Curve corresponding to the total Unforced Capacity provided by all such Sell Offers.

  • Newell and Dr. Kathleen Spees on Behalf of PJM Interconnection, LLC Regarding Periodic Review of Variable Resource Requirement Curve Shape and Key Parameters,” September 25, 2014.

  • The report shall include the key technical milestone met or actions accomplished.

  • To address capacity obligation quantity uncertainty associated with the Variable Resource Requirement Curve, a Load Serving Entity may submit a Sell Offer with a contingent designation of a portion of its Capacity Resources as either Self- Supply (to the extent required to meet a portion (as specified by the LSE) of the LSE’s peak load forecast in each transmission zone) or as not Self-Supply (to the extent not so required) and subject to an offer price, in accordance with the PJM Manuals.

  • It is recognized that the variable resource requirement reflected in the Variable Resource Requirement Curve can result in an optimized auction clearing in which the level of Capacity Resources committed for a Delivery Year exceeds the PJM Region Reliability Requirement (less the Forecast RTO ILR Obligation) or Locational Deliverability Area Reliability Requirement (less the Forecast Zonal ILR Obligation for the Zones associated with such LDA) for such Delivery Year.

  • To address capacity obligation quantity uncertainty associated with the Variable Resource Requirement Curve, a Load Serving Entity may submit a Sell Offer with a contingent designation of a portion of its Capacity Resources as either Self-Supply (to the extent required to meet a portion (as specified by the LSE) of the LSE’s peak load forecast in each transmission zone) or as subject to an offer price (to the extent not so required), in accordance with the PJM Manuals.

  • The Variable Resource Requirement Curve provided for a price equal to the cost of new entry of a new peaking unit when the amount of capacity to be supplied is one percent greater than the Installed Reserve Margin, with prices rising when the amount of the capacity within the Locational Delivery Area fell, but falling when the amount of capacity within the Locational Delivery Area rose.2117.

  • The same process as set forth in subsection (a)(i) shall be used to establish the Variable Resource Requirement Curve for any such LDA, except that the Locational Deliverability Area Reliability Requirement for such LDA shall be substituted for the PJM Region Reliability Requirement and, for Delivery Years through May 31, 2018, the LDA Short-Term Resource Procurement Target shall be substituted for the PJM Region Short-Term Resource Procurement Target.

  • For each LDA for which the Office of the Interconnection is required to establish a separate Variable Resource Requirement Curve for any Delivery Year addressed by such FRR Capacity Plan, the plan must include a Percentage Internal Resources Required, subject to subsections D.1.1 and D.2 of this Schedule.


More Definitions of Variable Resource Requirement Curve

Variable Resource Requirement Curve means a series of maximum prices that can be cleared in a Base Residual Auction for Unforced Capacity, corresponding to a series of varying resource requirements based on varying installed reserve margins, as determined by the Office of

Related to Variable Resource Requirement Curve

  • Minimum Annual Resource Requirement means, for Delivery Years through May 31, 2017, the minimum amount of capacity that PJM will seek to procure from Annual Resources for the PJM Region and for each Locational Deliverability Area for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for such Delivery Year. For the PJM Region, the Minimum Annual Resource Requirement shall be equal to the RTO Reliability Requirement minus [the Sub-Annual Resource Reliability Target for the RTO in Unforced Capacity]. For an LDA, the Minimum Annual Resource Requirement shall be equal to the LDA Reliability Requirement minus [the LDA CETL] minus [the Sub-Annual Resource Reliability Target for such LDA in Unforced Capacity]. The LDA CETL may be adjusted pro rata for the amount of load served under the FRR Alternative.

  • California Renewables Portfolio Standard means the renewable energy program and policies codified in California Public Utilities Code Sections 399.11 through 399.31 and California Public Resources Code Sections 25740 through 25751, as such provisions may be amended or supplemented from time to time.

  • Minimum Extended Summer Resource Requirement means, for Delivery Years through May 31, 2017, the minimum amount of capacity that PJM will seek to procure from Extended Summer Demand Resources and Annual Resources for the PJM Region and for each Locational Deliverability Area for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for such Delivery Year. For the PJM Region, the Minimum Extended Summer Resource Requirement shall be equal to the RTO Reliability Requirement minus [the Limited Demand Resource Reliability Target for the PJM Region in Unforced Capacity]. For an LDA, the Minimum Extended Summer Resource Requirement shall be equal to the LDA Reliability Requirement minus [the LDA CETL] minus [the Limited Demand Resource Reliability Target for such LDA in Unforced Capacity]. The LDA CETL may be adjusted pro rata for the amount of load served under the FRR Alternative.

  • Eligible Renewable Energy Resource or “ERR” has the meaning set forth in California Public Utilities Code Section 399.12 and California Public Resources Code Section 25741, as either code provision is amended or supplemented from time to time.

  • Renewable resource means: (a) Water; (b) wind; (c) solar

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Renewable Resources means one of the following sources of energy: solar, wind, tidal, geothermal, biomass, hydroelectric facilities or digester gas.

  • Flexible Resource means a generating resource that must have a combined Start-up Time and Notification Time of less than or equal to two hours; and a Minimum Run Time of less than or equal to two hours. “Firm Point-To-Point Transmission Service” shall mean Transmission Service under the Tariff that is reserved and/or scheduled between specified Points of Receipt and Delivery pursuant to Tariff, Part II.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • performance requirement means a requirement that:

  • Capacity Storage Resource means any Energy Storage Resource that participates in the Reliability Pricing Model or is otherwise treated as capacity in PJM’s markets such as through a Fixed Resource Requirement Capacity Plan.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Base Capacity Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Resources and the clearing price for Capacity Performance Resources, representing the cost to procure additional Capacity Performance Resources out of merit order when the Base Capacity Resource Constraint is binding.

  • Variable-aperture beam-limiting device means a beam-limiting device which has capacity for stepless adjustment of the x-ray field size at a given SID.

  • MONTHLY KILOMETREAGE STATEMENT CUM BILL means the format specified by the Company.

  • Maximum Concentration Level Assessment means the Maximum Concentration Level Assessment for the purposes of a Basic Comprehensive Certificate of Approval, described in the Basic Comprehensive User Guide, prepared by a Toxicologist using currently available toxicological information, that demonstrates that the concentration at any Point of Impingement for a Compound of Concern that does not have a Ministry Point of Impingement Limit is not likely to cause an adverse effect as defined by the EPA. The concentration at Point of Impingement for a Compound of Concern must be calculated in accordance with O. Reg. 419/05.

  • Maximum allowable residential density means the density allowed under the zoning ordinance and land use element of the general plan, or if a range of density is permitted, means the maximum allowable density for the specific zoning range and land use element of the general plan applicable to the project. Where the density allowed under the zoning ordinance is inconsistent with the density allowed under the land use element of the general plan, the general plan density shall prevail.

  • Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).

  • Contract Minimum Investment Requirement means, with respect to the Project, investment by the Company and any Sponsor Affiliates of at least $4,000,000 in Economic Development Property subject (non-exempt) to ad valorem taxation (in the absence of this Fee Agreement).

  • Energy storage system means a system which stores energy and releases it in the same form as was input.

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement.

  • Energy Settlement Area means the bus or distribution of busses that represents the physical location of Network Load and by which the obligations of the Network Customer to PJM are settled.

  • Renewable Energy Source means an energy source that is not fossil carbon-based, non- renewable or radioactive, and may include solar, wind, biomass, geothermal, landfill gas, or wave, tidal and thermal ocean technologies, and includes a Certified Renewable Energy Source.

  • Data Processing Equipment means any equipment, computer hardware, or computer software (and the lease or licensing agreements related thereto) other than Personal Computers, owned or leased by the Failed Bank at Bank Closing, which is, was, or could have been used by the Failed Bank in connection with data processing activities.

  • Electric bicycle means a “class 1 electric bicycle”, a “class 2 electric bicycle”, or a “class 3 electric bicycle” as defined in this section. (ORC 4511.01(RRR))

  • Energy Storage Resource means a resource capable of receiving electric energy from the grid and storing it for later injection to the grid that participates in the PJM Energy, Capacity and/or Ancillary Services markets as a Market Participant.