Examples of Voltage Events in a sentence
What usage data should the utility acquire through the smart metering system?• Each meter should be programmable so that a 1-, 5-, 15-, 30- or 60-minute interval could be set, though this interval should be based upon customer/EGS requirements, as opposed to being administratively set ahead of time by the Commission.• Each meter should also provide data with respect to Voltage Events.
Grid Fault Shutdown Trip Limits for Over/Under Voltage Events Over Voltage (Protective Function 59)Primary Over Voltage TripThe Primary Over Voltage is adjustable from 528 VL-L down to the Under Voltage set point.
Grid Fault Shutdown Trip Limits for Over/Under Voltage Events 9-4Figure 10-2.