Wastewater Main definition
Examples of Wastewater Main in a sentence
Parking Lot, Wastewater Main and HVAC System, Bridges, and Irrigation System.
No Person shall construct a Water and/or Wastewater Main or extension thereof within the Service Area of the District without first having written approval of a formal application to the District and having complied with the Rules and Regulations, policies and resolutions of the District.
The cost for the Water and/or Wastewater Main and appurtenances thereto, including but not limited to, design, material and construction costs, shall be the sole responsibility of the Developer.
The Sewer Lateral is a pipe that takes an individual building’s Wastewater to the Wastewater Main in the Public Right-of-Way or in a Public Utility Easement.
The portion of the wastewater pipe from the Wastewater Main to the City Sewer Cleanout or to the property line if there is no City Sewer Cleanout.See City Lateral.
The Offsite Wastewater Main Project includes the wastewater main and those facilities and equipment required for the wastewater main to function efficiently, to provide service to the Property, and to comply with all applicable state and local rules, regulations and standards, approved construction plans, and good design and engineering practices.
The Offsite Water Main Project, the Offsite Wastewater Main Project, and the Onsite Wastewater Project shall be referred to collectively as the “Project”.
The offsite wastewater main project consists of the construction, installation, and extension of approximately 3,000 linear feet of offsite wastewater collector main, oversized from eight inches (8”) to twelve inches (12”) in diameter, southward along CR 175 and then westward through an existing easement to the City’s existing thirty-six inch (36”) Brushy Creek Wastewater Interceptor, along the route approved by the City and generally shown in green in Exhibit B (the “Offsite Wastewater Main Project”).