Examples of Wastewater Sewer in a sentence
Little Rock Wastewater: Sewer main extension required, with easements, if new sewer service is required for this project.
SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of Wastewater Sewer Rehabilitation by Cured-in-Place (CIPP) methods.
Wastewater: Sewer main extension required with easements if new sewer service is required for this project.
Outlines the capital projects included in the budget for the General, Water and Wastewater (Sewer) Funds.
Department of Public Works - NEORSD: Sewer Wastewater Grit Disposal- Contract Amendment Scope of Work SummaryThe Department of Public Works is submitting an Inter-Governmental contract amendment for the disposal of Wastewater Sewer Grit with the Northeast Ohio Regional Sewer District for the anticipated cost of $490,000.00 and extend the time-period from January 1, 2023, through December 31, 2023.The primary goal of the project is to dispose of Sewer Wastewater Grit at a certified disposal site.
All utility crossings shall also be shown and identified in the plan and profile.5.2 Wastewater Sewer Laterals (Side Sewers)The location of all proposed wastewater sewer laterals and tees shall be clearly shown on the plan (station location of each end of the lateral).
Wastewater: Sewer main extension required with easement if new service is required for this project.
DEVELOPER shall be responsible for providing all exhibits required for the amendment to CITY’s Wastewater Sewer Agreement with the City of Omaha as requested by CITY.
Table 3 shows that CVSan’s facilities are allocated at approximately 95.74% of asset values to flow and 2.13% for both BOD and TSS.Table 3Castro Valley SDSummary of Wastewater Sewer System AllocationAllocation PercentagesAllocation of Dollars Asset CategoryFlowBOD Using the above allocation percentages, BWA calculates that $395,492,075 of assets are used for flow and $8,880,385 is used for both BOD and TSS.
Proposed Developments shall be drained on the basis of a completely separate Wastewater Sewer system and Storm Water Collection system as outlined in Section 1.5. 3.2 Reliability and Design Objectives Pipes shall be free from defects or other features that might cause blockage or otherwise impede the design flow.