Water shortage response plan definition

Water shortage response plan means a plan out- lining policies and activities to be implemented to reduce water use on a short-term basis during or in anticipation of a water shortage.
Water shortage response plan means a plan outlining poli- cies and activities to be implemented to reduce water use on a short- term basis during or in anticipation of a water shortage.
Water shortage response plan means a plan outlining policies and activities to be implemented to reduce water use on a short-term basis during or in anticipa- tion of a water shortage.

More Definitions of Water shortage response plan

Water shortage response plan means an operational plan used by the Town to respond to water shortage events.
Water shortage response plan means a plan outlining policies and activities to be implemented to reduce water use on a short-term basis during or in anticipation of awater shortage.

Related to Water shortage response plan

  • Emergency Response Plan means the plan constituting the set of procedures developed by the Owner for dealing with an Incident which may impact on the Network or Connecting Infrastructure, including all actions to be taken to minimise or alleviate any threat or danger to any person or property:

  • Line-voltage regulation means the difference between the no-load and the load line potentials expressed as a percent of the load line potential. It is calculated using the following equation:

  • Emergency Load Response Program means the program by which Curtailment Service Providers may be compensated by PJM for Demand Resources that will reduce load when dispatched by PJM during emergency conditions, and is described in Operating Agreement, Schedule 1, section 8 and the parallel provisions of Tariff, Attachment K-Appendix, section 8.

  • Health professional shortage area means that term as defined in section 332(a)(1) of subpart II of part C of title III of the public health service act, chapter 373, 90 Stat. 2270, 42 U.S.C. 254e.

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • PQQ Response means the response submitted by the Supplier to the pre-qualification questionnaire issued by the Authority on 06/03/2012;

  • Stormwater Pollution Prevention Plan or "SWPPP" means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges from the construction site, and otherwise meets the requirements of this Ordinance. In addition the document shall identify and require the implementation of control measures, and shall include, but not be limited to the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan.

  • Past Response Costs means all costs, including, but not limited to, direct and indirect costs, that the United States paid at or in connection with the Site through [insert date of most recent cost summary], plus Interest on all such costs through such date.]

  • National Pollutant Discharge Elimination System means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements under Sections 307, 402, 318, and 405 of the Clean Water Act.

  • Emergency Medical Transportation means the transportation, by ambulance, of sick, injured or otherwise incapacitated persons who require emergency medical care.

  • Septage means the liquid and solid material pumped from a septic tank, cesspool, or similar domestic sewage treatment system, or from a holding tank, when the system is cleaned or maintained.

  • Combatant Commander means the commander of a unified or specified combatant command established in accordance with 10 U.S.C. 161.

  • Adopt a comprehensive land use plan means to enact a new

  • High Quality Short-Term Debt Instruments means any instrument that has a maturity at issuance of less that 366 days and that is rated in one of the two highest rating categories by a Nationally Recognized Statistical Rating Organization.

  • Navigable waters ’ means the waters of the United States, including the territorial sea;

  • Emergency Response Agency is a governmental entity authorized to respond to requests from the public to meet emergencies.

  • High Quality Short-Term Debt Instrument means any instrument having a maturity at issuance of less than 366 days and which is rated in one of the highest two rating categories by a Nationally Recognized Statistical Rating Agency (Moody’s and S&P).

  • Backflow Prevention Assembly means any mechanical assembly installed at a water service line or at a plumbing fixture to prevent a backflow contamination event, provided that the mechanical assembly is appropriate for the identified contaminant at the cross connection and is an in-line field-testable assembly.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • FIPPA means the Freedom of Information and Protection of Privacy Act (Ontario) and the regulations made under it as it and they may be amended from time to time;

  • Remedial response means a measure to stop and correct prohibited conduct, prevent prohibited conduct from recurring, and protect, support, and intervene on behalf of a student who is the target or victim of prohibited conduct.

  • Explosives or munitions emergency response means all immediate response activities by an explosives and munitions emergency response specialist to control, mitigate, or eliminate the actual or potential threat encountered during an explosives or munitions emergency. An explosives or munitions emergency response may include in-place render-safe procedures, treatment or destruction of the explosives or munitions and/or transporting those items to another location to be rendered safe, treated, or destroyed. Any reasonable delay in the completion of an explosives or munitions emergency response caused by a necessary, unforeseen, or uncontrollable circumstance will not terminate the explosives or munitions emergency. Explosives and munitions emergency responses can occur on either public or private lands and are not limited to responses at RCRA facilities.

  • Natural radioactivity means radioactivity of naturally occurring nuclides.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Sewage treatment plant means any arrangement of devices and structures used for treating sewage.

  • Underground source of drinking water means an aquifer or its portion: