Examples of Well Pump in a sentence
Well Pump $75 All components and parts of well pump if utilized for primary dwelling.
During the term of coverage, subject to the terms and conditions of this Agreement, We agree, in the event of a covered Breakdown, to arrange for a service provider to repair, or replace the External Water line or Well Pump or repair, reline or replace the External Sewer Line, if indicated with an “X” as purchase on Declaration Page, and indicated as covered and located at the Dwelling listed on the Declaration Page.
Coverage for access, diagnosis and repair or replacement for the External Water line or Well Pump or repair, reline or replacement for the External Sewer Line is listed on the Declaration Page.
ADDITIONAL BUYER OPTIONS: Additional Refrigerator, Built-In Wine Cooler, Freestanding Freezer, Wet Bar Refrigerator (sold separately) $40 Extended Pipe Leak $60 Roof Leak $100 Pool/Spa Freshwater $160 Pool/Spa Saltwater $345 Additional Pool/Spa $160 Septic System $45 Water Softener $80 Well Pump $75 Wherever you see this symbol, it indicates the maximum value and protection for your home or our industry exclusive coverage.
Cost to diagnose, repair and/or replace $1,000 Well Pump: $75 l All components and parts of well pump if utilized for primary dwelling.
The capacities, heads, efficiencies, and horsepower requirements are for completely assembled units and are specified in the Detailed Submersible Well Pump Specification section.
The motor shall be rated for the horsepower and RPM specified in the Detailed Submersible Well Pump Specification Section 1.02, 3 phase, 60 Hz, 480 volt, with a minimum service factor of 1.15.
Piping and Electrical Lines, Well Casing, Holding, Storage or Pressure Tank, Re-drilling of the Well, Control Boxes, Pressure Switches, Capacitors or Relays, Well Pump and Well Pump Components for Geothermal and/or Water Source Heat Pumps, Outside or Underground Piping and Components for Geothermal and/or Water Source Heat Pumps, Access to Repair well pump system.
Remote manual and automatic control is anticipated for two LAS pumps, one Chlorinator, one Well Pump and two High Service Pumps per site.
The purpose of this Exhibit A is to provide final design engineering services for Phase III of the City of Milpitas Well Upgrade Project - Xxxxxx Well Pump Building to account for various design, code, and submittal requirement changes that have occurred since the time when the project was first bid.