XXXXX Environmental Management Plan definition

XXXXX Environmental Management Plan means the environmental plan that XXXXX prepares and serves on the Council and other agencies.

Related to XXXXX Environmental Management Plan

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Environmental Management System means an environmental management system or plan of management to address all environmental risks and to ensure compliance with all Environmental Laws and licences;

  • Environmental Management Framework and “EMF” mean the framework of the Borrower for the management of social and environmental aspects of the Project dated April 24, 2007 and disclosed to the public on even date therewith, as may be amended from time to time with the prior approval of the Bank.

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.

  • Remediation waste management site means a facility where an owner or operator is or will be treating, storing or disposing of hazardous remediation wastes. A remediation waste management site is not a facility that is subject to corrective action under § 264.101 of this regulation, but is subject to corrective action requirements if the site is located in such a facility.

  • Environmentally-Limited Resource means a resource which has a limit on its run hours imposed by a federal, state, or other governmental agency that will significantly limit its availability, on either a temporary or long-term basis. This includes a resource that is limited by a governmental authority to operating only during declared PJM capacity emergencies.

  • Hazardous Waste Management Facility means, as defined in NCGS 130A, Article 9, a facility for the collection, storage, processing, treatment, recycling, recovery, or disposal of hazardous waste.

  • Pest Management Plan and “PMP” means the Recipient’s plan dated March 9, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and (iv) as part of the implementation arrangements, identifies national agencies and other partners that could play a vital role in the success of the Project.

  • Solid waste management facility means the same as that term is defined in Section 19-6-502.

  • Transportation Company means any organization which provides its own or its leased vehicles for transportation or which provides freight forwarding or air express services.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Environmental, Health and Safety Liabilities means any cost, damages, expense, liability, obligation or other responsibility arising from or under Environmental Law or Occupational Safety and Health Law and consisting of or relating to:

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Environmental and Social Management Framework or “ESMF” means an instrument satisfactory to the Association, prepared and adopted by the Recipient and dated February 5, 2010 outlining the process for management of the environmental and social aspects of the Project as the same may be amended from time to time with the Association’s prior written concurrence.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Safety Management System has the meaning given to it in the ISM Code.

  • Environmental, Health and Safety Laws means the Comprehensive Environmental Response, Compensation and Liability Act of 1980, the Resource Conservation and Recovery Act of 1976, and the Occupational Safety and Health Act of 1970, each as amended, together with all other laws (including rules, regulations, codes, plans, injunctions, judgments, orders, decrees, rulings, and charges thereunder) of federal, state, local, and foreign governments (and all agencies thereof) concerning pollution or protection of the environment, public health and safety, or employee health and safety, including laws relating to emissions, discharges, releases, or threatened releases of pollutants, contaminants, or chemical, industrial, hazardous, or toxic materials or wastes into ambient air, surface water, ground water, or lands or otherwise relating to the manufacture, processing, distribution, use, treatment, storage, disposal, transport, or handling of pollutants, contaminants, or chemical, industrial, hazardous, or toxic materials or wastes.

  • Production Environment means a logical group of virtual or physical computers comprised within the Cloud Environment to which the Customer will be provided with access and use the purchased Cloud Application(s) in production and for its generally marketed purpose.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Material support and resources means currency or monetary instruments or financial securities, financial services, lodging, training, expert advice or assistance, safehouses, false documentation or identification, communications equipment, facilities, weapons, lethal substances, explosives, personnel, transportation, and other physical assets, except medicine or religious materials.”

  • Yard waste means leaves, grass clippings, yard and garden debris and brush, including clean woody vegetative material no greater than 6 inches in diameter. This term does not include stumps, roots or shrubs with intact root balls.

  • Wood waste means untreated wood and untreated wood products, including tree stumps (whole or chipped), trees, tree limbs (whole or chipped), bark, sawdust, chips, scraps, slabs, millings, and shavings. Wood waste does not include:

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.