000 Abandoning Existing Water System Sample Clauses

000 Abandoning Existing Water System. The portions of the water system that are replaced or no longer needed shall be disconnected from the active water system and abandoned or removed, as directed by the District and the jurisdictional authority. Whichever requirement is more stringent shall apply. At a minimum, all pipe sections that remain in the ground shall be filled with flowable CDF and the ends capped/plugged with fittings containing rubber gaskets that will withstand static pressure. Any pipe, fittings or other removed system components shall be properly disposed of by the Developer/Contractor. DIVISION 3 Standards for Sewer Installation Division 3 Standards for Sewer Installation Table of Contents 3-1.000 SANITARY SEWER INSTALLATION 4 3-1.010 General 4 3-1.020 Construction Standards 4 3-2.000 MATERIALS AND INSTALLATION 4 3-2.010 General 4 3-2.020 Pipe Materials 4 3-2.030 Pipe Installation 5 3-2.040 Lampholes 8 3-2.050 Sewer Laterals 8 3-2.060 Precast Concrete Manholes 9 3-3.000 TESTING 12 3-4.000 Early Sewer System Access 14 3-4.010 Existing Buildings 14 3-4.020 Model Home Sewer Permit(s) for Single Family Recorded Plats 14 3-5.000 Bypassing Sewer Flows 15 3-5.010 Bypass Flow Through Plugs 15 3-5.020 Bypass Pumping or Hauling 15 3-6.000 Abandoning Existing Sewer System 16 DETAILS Open S-1 Open S-2 Standard Precast Xxxxxxx X-0 Saddle Manhole S-3A Polypropylene Ladder & Manhole Steps S-4 Manhole Frame and Cover S-5 Shallow Xxxxxxx X-0 Open S-7 Drop Manhole Connection S-8 Force Main, Drop Manhole Connection X-0X Xxxxxxxx/Xxxxxxxx X-0 Sewer Lateral - New Construction S-10 Alternate Sewer Lateral – New Construction S-10A Standing Sewer Lateral – New Construction S-10B Sewer Lateral – Existing Mains S-11 1-Inch Ai/Vacuum Release S-12 Valve Marker Post S-13 3-1.000 SANITARY SEWER INSTALLATION
AutoNDA by SimpleDocs

Related to 000 Abandoning Existing Water System

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Use of existing infrastructure (3) Each of the proposals pursuant to subclause (1) may with the consent of the Minister and that of any other parties concerned instead of providing for the construction of new facilities or equipment or the provision of new services of the kind therein mentioned provide for the use by the Company of any existing facilities equipment or services of such kind belonging to the Company or the Mount Xxxxxx Participants during any period when the Company is associated with the Mount Xxxxxx Participants, or upon reasonable terms and conditions of any other existing facilities equipment or services of such kind. Additional submissions

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

Time is Money Join Law Insider Premium to draft better contracts faster.