Trial Service Period 1. Except for those employees in an in-training appointment, all other employees with permanent status who are promoted, or who voluntarily accept a transfer or demotion into a job classification for which they have not previously attained permanent status, will serve a trial service period of six (6) consecutive months. The Employer may extend the trial service period to no more than twelve (12) consecutive months, provided the employee is given written, performance based reasons for the extension. The Employer agrees to notify the employee when it intends to extend the trial service period beyond six (6) months. The employee may choose to notify the union.
Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.
Acceptance Period For all Services provided under this Agreement, Vendor grants to Citizens a thirty (30) calendar day acceptance period ("Acceptance Period") commencing on the date completed Services are delivered to Citizens. Citizens shall have the right to reject the Services, in whole or in part, during the Acceptance Period for Vendor’s failure to meet the specifications associated with the delivered Services, with such determination to be made in Citizens’ reasonable judgment. At the end of the Acceptance Period, if Citizens has not rejected the Services, the Services shall be deemed to be accepted by Citizens; provided, however, that Citizens’ acceptance of the Services shall not be deemed a waiver of any of Citizens’ warranty rights as expressly provided in this Agreement.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Think 12 has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Think 12. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Think 12 (e.g. hairpinning):
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Non-Paid Status During Treatment After Positive Test The employee will be in a non-pay status during any absence for evaluation or treatment, while participating in a rehabilitation program.