Accuracy of surveys Sample Clauses

Accuracy of surveys. The accuracy of surveys in the horizontal plane, related to the relevant benchmarks for the project should be within 1.0 m. The accuracy of surveys in the vertical plane includes: - The echo sounder which should maintain a repeatable accuracy of better than 10 cm for measurements of distances between riverbed and survey vessel waterline. - The registration of water levels by means of automatic water level gauges which should be within 5 cm. wherever erection of automatic water level gauge is not found feasible, manual water level gauge shall be erected with prior approval of Engineer’s representative. The water level plane between the tide gauges and the survey location can be assumed horizontal. Survey lines on consecutive surveys should be sailed in the same direction.
AutoNDA by SimpleDocs

Related to Accuracy of surveys

  • Accuracy of Drawings Submitted All drawings shall be neat and professional in manner and shall be clearly labeled as to locations and type of Product, connections and components. Drawings and diagrams are to be in compliance with accepted drafting standards. Acceptance or approval of such plans shall not relieve the Contractor from responsibility for design or other errors of any sort in the drawings or plans, or from its responsibility for performing as required, furnishing Product, services or installation, or carrying out any other requirements of the intended scope of work.

  • Accuracy of Data (A) The Contractor shall ensure that the data received from Providers is accurate and complete by:

  • Accuracy of Representations All of Buyer’s representations and warranties in this Agreement (considered collectively), and each of these representations and warranties (considered individually), must have been accurate in all material respects as of the date of this Agreement and must be accurate in all material respects as of the Closing Date as if made on the Closing Date.

  • SATISFACTION SURVEYS In order to assess the level of performance of the Supplier, the Customer may undertake satisfaction surveys in respect of the Supplier's provision of the Services. The Customer shall be entitled to notify the Supplier of any aspects of their performance of the provision of the Services which the responses to the Satisfaction Surveys reasonably suggest are not in accordance with this Call Off Contract. All other suggestions for improvements to the provision of Services shall be dealt with as part of the continuous improvement programme pursuant to Clause 17 of this Call Off Contract (Continuous Improvement). 12/08/2013 ANNEX 1 TO PART B: ADDITIONAL PERFORMANCE MONITORING REQUIREMENTS [ ]

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • HHSC SPECIAL CONDITIONS The terms and conditions of these Special Conditions are incorporated into and made a part of the Contract. Capitalized items used in these Special Conditions and not otherwise defined have the meanings assigned to them in HHSC Uniform Terms and Conditions -Grant- Version 2.16.1

  • Review of Submittals A/E and ODR review is only for conformance with the design concept and the information provided in the Contract Documents. Responses to submittals will be in writing. The approval of a separate item does not indicate approval of an assembly in which the item functions. The approval of a submittal does not relieve the Contractor of responsibility for any deviation from the requirements of the Contract unless the Contractor informs the A/E and ODR of such deviation in a clear, conspicuous, and written manner on the submittal transmittal and at the time of submission, and obtains the A/E’s and Owner’s written specific approval of the particular deviation.

  • – OTHER SPECIAL CONDITIONS The following additional special conditions apply to this agreement:

  • Accuracy of Information No information, exhibit or report furnished by the Borrower or any of its Subsidiaries to the Administrative Agent or to any Lender in connection with the negotiation of, or compliance with, the Loan Documents contained any material misstatement of fact or omitted to state a material fact or any fact necessary to make the statements contained therein not misleading.

Time is Money Join Law Insider Premium to draft better contracts faster.