Proposed Policies and Procedures Regarding New Online Content and Functionality By October 31, 2017, the School will submit to OCR for its review and approval proposed policies and procedures (“the Plan for New Content”) to ensure that all new, newly-added, or modified online content and functionality will be accessible to people with disabilities as measured by conformance to the Benchmarks for Measuring Accessibility set forth above, except where doing so would impose a fundamental alteration or undue burden. a) When fundamental alteration or undue burden defenses apply, the Plan for New Content will require the School to provide equally effective alternative access. The Plan for New Content will require the School, in providing equally effective alternate access, to take any actions that do not result in a fundamental alteration or undue financial and administrative burdens, but nevertheless ensure that, to the maximum extent possible, individuals with disabilities receive the same benefits or services as their nondisabled peers. To provide equally effective alternate access, alternates are not required to produce the identical result or level of achievement for persons with and without disabilities, but must afford persons with disabilities equal opportunity to obtain the same result, to gain the same benefit, or to reach the same level of achievement, in the most integrated setting appropriate to the person’s needs. b) The Plan for New Content must include sufficient quality assurance procedures, backed by adequate personnel and financial resources, for full implementation. This provision also applies to the School’s online content and functionality developed by, maintained by, or offered through a third-party vendor or by using open sources. c) Within thirty (30) days of receiving OCR’s approval of the Plan for New Content, the School will officially adopt, and fully implement the amended policies and procedures.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.
Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.
XXX Hosting 10.1 XXX Hosting is not required for resale in the BellSouth region.
Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.
Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.
Training Program It is agreed that there shall be an Apprenticeship Training Program, the provisions of which are set forth in Exhibit "D", which is attached hereto and forms part of this Agreement.
Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.
Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.