Ambient noise Sample Clauses

Ambient noise. The background noise provisions shall be in line with Annex 3 of this UN Regulation.
AutoNDA by SimpleDocs
Ambient noise. 11 Attach additional sheets as needed to fully describe observed deficiencies. 12 Attach additional sheets as needed to fully describe corrective actions and implementation. Monitoring Location (please specify) – Residential, institutional, educational receptors, Daytime (07:00-22:00 hours) Leq (hourly), 55 dB(A) dB(A) Residential, institutional, educational receptors, Nighttime (22:00-07:00 hours) Leq (hourly), 45 dB(A) dB(A) Industrial, commercial receptors Daytime (07:00-22:00 hours) Leq (hourly), 70 dB(A) dB(A) Industrial, commercial receptors, Night time (22:00-07:00 hours) Leq (hourly), 70 dB(A) dB(A)
Ambient noise. GEOPARK is required to monitor ambient noise at an agreed number of representative receptors immediately outside the property boundary and report the results to IFC annually. Ambient noise monitoring must take place while the facility is operating. Residential, institutional, educational receptors, Daytime (07:00-22:00 hours) Leq (hourly), 55 dB(A) dB(A) Residential, institutional, educational receptors, Nighttime (22:00-07:00 hours) Leq (hourly), 45 dB(A) dB(A) Industrial, commercial receptors Daytime (07:00-22:00 hours) Leq (hourly), 70 dB(A) dB(A) Industrial, commercial receptors, Nighttime (22:00-07:00 hours) Leq (hourly), 70 dB(A) dB(A) GEOPARK is required to collect representative samples of liquid effluent discharges to surface waters at an agreed frequency, submit these samples for laboratory analysis and report the results to IFC. Individual samples and individual reports are required for each surface water discharge point (e.g. sanitary waste, process effluent, and contaminated storm water). Create sufficient sections in the table for each separate emission point by copying and pasting the sections. o Please describe the water course(s) which the effluent is discharged into (e.g. river, municipal system, sea). o If the effluent is treated prior to discharge from the site please describe the level of treatment provided. o If the effluent is discharged into a municipal system please confirm the level of treatment provided and where the municipal system discharges to. pH 6-9 Biochemical oxygen demand (BOD5) 50 mg/L mg/L Chemical oxygen demand (COD) 250 mg/L mg/L Oil and grease 10 mg/L mg/L Total suspended solids (TSS) 50 mg/L mg/L Total coliform bacteria, Most Probable Number (MPN) or plate count (PC) £ 400 /100 ml /100 mls Ambient temperature of receiving waters at edge of zone where mixing with effluent takes place (if not defined, 100 meters from discharge point). £ 3°C (maximum increase is 3°C) °C Heavy Metals, Total 10 mg/L mg/L (list other parameters) mg/L mg/L mg/L mg/L Corrective Actions If any of the World Bank Group or Argentina-Chile guideline levels in any of the above tables are exceeded please explain the cause and, if appropriate, describe the planned corrective actions to prevent re-occurrence. Solid and Hazardous GEOPARK is required to monitor collection and disposal of solid and hazardous waste and report the measurement results for each period to IFC. · chemical containers Month/Year: · chemical sludge Month/Year: · containers/pal...
Ambient noise. Ambient Noise refers to noise levels outside of COSAN’s boundaries. COSAN is required to collect representative samples of ambient noise and submit these samples for laboratory analysis and report the results to IFC. Individual samples and individual reports will be required for each ambient noise monitoring point. Please provide Brazilian maximum levels in Brazilian units in the table below. Ambient Noise Monitoring Point Ambient Noise Monitoring Description Location22 22 Provide latitude, longitude of the ambient noise monitoring point. Alternatively provide a scaled facility map showing the precise location of the monitoring points. Nearest Residential, Institutional or Educational Receptors Daytime (07:00-22:00 hours) Quarterly 55 dB(A) dB(A) Nearest Residential, Institutional or Educational Receptors Nighttime (22:00-07:00 hours) Quarterly 45 dB(A) dB(A) Nearest Industrial or Commercial Receptors Daytime (07:00-22:00 hours) Quarterly 70 dB(A) dB(A) Nearest Industrial or Commercial Receptors Nighttime (22:00-07:00 hours) Quarterly 70 dB(A) dB(A) 1. For ambient noise monitoring point number , list parameters that exceed WBG/IFC guidelines and Host Country, adjective regulatory limits. Monitoring Parameter(s) Exceedance(s) 1. 2. 2. Describe cause(s) for monitoring parameter(s) exceedance(s) Monitoring Parameter(s) Exceedance(s) 1. 2. 3. 3. Describe corrective action(s) to improve emissions quality and schedule for completion of needed improvements. Monitoring Parameter(s) Exceedance(s) 1. 2. 3.
Ambient noise. Any equipment installed by Landlord in the Building shall not cause an ambient noise level in the Office Premises which exceeds NC-40 at all points within the interior of the Office Premises except within 10’-0” of a mechanical equipment room, where it will not exceed NC-42. In the event that Landlord is in default of its obligations under this Section 18.15 beyond applicable notice and cure periods, then Landlord shall, as Tenant’s sole remedy in respect thereof, undertake and pay for such testing and additional sound proofing as is reasonable required to cure the default and shall follow the reasonable guidelines established by an acoustic consultant reasonably approved by Tenant for the purposes of further attenuating any risk of noise from equipment installed by Landlord in excess of the limits provided hereunder, all at Landlord’s sole cost and expense. Notwithstanding the foregoing, Tenant acknowledges that the base Building emergency generator is located on the 15th floor of the Building and that when such generator is run for testing and maintenance or when operated during a Building power outage, the noise from such generator may exceed the foregoing limitations. Landlord agrees that, except in emergency circumstances or where required by applicable Requirements, all routine testing and maintenance of such emergency generator will be performed at times other than Business Hours of Business Days.

Related to Ambient noise

  • Wildlife Do not feed any of the wildlife ever. Animals of any size are potentially dangerous. Feeding even small animals attracts predators. Supervise children at all times. Keep garage doors closed at all times except when entering or leaving the Rental Home.

  • Smoke Free Environment The Lessor shall make all parts of the leased premise smoke-free. "

  • Noise The Hirer shall ensure that the minimum of noise is made on arrival and departure, particularly late at night and early in the morning. The Hirer shall, if using sound amplification equipment, make use of any noise limitation device provided at the premises and comply with any other licensing condition for the premises.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Emissions The provisions cited above do not prohibit emissions above a specified level. Without information on engine usage and emission rates, it is not practicable to quantify the excess emissions. However, since CARB has alleged that the vessel(s) did not meet the regulatory requirements, all of the emissions from it were excess and illegal.

  • Environment Each of the Obligors: (a) is in compliance with all applicable federal, state, local, foreign and international laws, regulations, conventions and agreements relating to pollution prevention or protection of human health or the environment (including, without limitation, ambient air, surface water, ground water, navigable waters, water of the contiguous zone, ocean waters and international waters), including without limitation, laws, regulations, conventions and agreements relating to: (i) emissions, discharges, releases or threatened releases of chemicals, pollutants, contaminants, wastes, toxic substances, hazardous materials, oil, hazard substances, petroleum and petroleum products and by-products (“Materials of Environmental Concern”); or (ii) the manufacture, processing, distribution, use, treatment, storage, disposal, transport or handling of Materials of Environmental Concern (such laws, regulations, conventions and agreements the “Environmental Laws”); (b) has all permits, licences, approvals, rulings, variances, exemptions, clearances, consents or other authorisations required under applicable Environmental Laws (“Environmental Approvals”) and are in compliance with all Environmental Approvals required to operate its business as presently conducted or as reasonably anticipated to be conducted; (c) has not received any notice, claim, action, cause of action, investigation or demand by any other person, alleging potential liability for, or a requirement to incur, investigatory costs, clean-up costs, response and/or remedial costs (whether incurred by a governmental entity or otherwise), natural resources damages, property damages, personal injuries, attorney’s fees and expenses or fines or penalties, in each case arising out of, based on or resulting from: (i) the presence or release or threat of release into the environment of any Material of Environmental Concern at any location, whether or not owned by such person; or (ii) circumstances forming the basis of any violation, or alleged violation, of any Environmental Law or Environmental Approval (“Environmental Claim”); and there are no circumstances that may prevent or interfere with such full compliance in the future. There is no Environmental Claim pending or threatened against any of the Obligors. There are no past or present actions, activities, circumstances, conditions, events or incidents, including, without limitation, the release, emission, discharge or disposal of any Material of Environmental Concern, that could form the basis of any Environmental Claim against any of the Obligors.

  • Wetlands When disposing of excess, soil, or other construction materials on public or private property, Contractor shall not fill in or otherwise convert wetlands.

  • Smoke This peril means sudden and accidental damage from smoke, including the emission or puffback of smoke, soot, fumes or vapors from a boiler, furnace or related equipment. This peril does not include loss caused by smoke from agricultural smudging or industrial operations.

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!