Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 59 contracts

Samples: Public Services, Public Facilities and Improvements, Contract

AutoNDA by SimpleDocs

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 35 contracts

Samples: Florence Sylvester, Contract, Contract

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 15 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County with the Contractor’s concurrence has the discretion with the Subrecipient’s concurrence, to make request official changes at any time without changing the scope or price intent of the Contract.‌ this Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver services, or the project schedule, the Subrecipient will Contractor shall give the County written notice no later ten (10) than seven calendar days from the date the law or regulation went into effect or the date the change was proposed by the County and Subrecipient the Contractor was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-County assigned Contract AdministratorDeputy Purchasing Agent, shall require the mutual consent of all Partiesparties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 11 contracts

Samples: Maintenance Consultant Services, Maintenance Consultant Services, Agreement

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County with the Contractor’s concurrence has the discretion with the Subrecipient’s concurrence, to make request official changes at any time without changing the scope or price intent of the Contract.‌ this Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver services, or the project schedule, the Subrecipient will Contractor shall give the County written notice no later ten than seven (107) calendar days from the date the law or regulation went into effect or the date the change was proposed by the County and Subrecipient the Contractor was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-County assigned Contract AdministratorDeputy Purchasing Agent, shall require the mutual consent of all Partiesparties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 10 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver servicesServices, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such , such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 10 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 8 contracts

Samples: Agreement, Agreement, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver services, or the project schedule, the Subrecipient Contractor will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 8 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver services, or the project schedule, the Subrecipient Contractor will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 7 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver servicesServices, or the project schedule, the Subrecipient Contractor will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such , such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 6 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 5 contracts

Samples: Agreement, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 4 contracts

Samples: cams.ocgov.com, www.ochcd.org, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver services, or the project schedule, the Subrecipient Contractor will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 4 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope of services or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver servicesServices, or the project schedule, the Subrecipient Contractor will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such , such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 4 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope of services or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver servicesServices, or the project schedule, the Subrecipient Contractor will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such , such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 4 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver services, or the project schedule, the Subrecipient Contractor will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 4 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver servicesServices, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such , such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 3 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

AutoNDA by SimpleDocs

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 3 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 3 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work services as originally set forth or as previously amended in this Contract.

Appears in 3 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver servicesServices, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such Any such proposed changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or in the Contract, as previously amended in this Contractamended.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such change such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient Contractor shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the SubrecipientContractor’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the SubrecipientContractor’s ability to deliver servicesservicesServices, or the project schedule, the Subrecipient Contractor will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient Contractor was notified of the change. Such Any such proposed changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of SupervisorssupervisorsSupervisors. Nothing herein shall prohibit the Subrecipient Contractor from proceeding with the work as originally set forth in the Contract, or as previously amended in this Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver servicessServices, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such Any such proposed changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of SupervisorssSupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth in the or as previously amended in this Contract, as amended.

Appears in 1 contract

Samples: cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver servicesServices, or the project schedule, the Subrecipient will give County written notice no later than ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such Any such proposed changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or in the Contract, as previously amended in this Contractamended.

Appears in 1 contract

Samples: cams.ocgov.com

Amendments - Changes/Extra Work. The Subrecipient shall make no changes to this Contract without the County’s written consent. In the event that there are new or unforeseen requirements, the County has the discretion with the Subrecipient’s concurrence, to make changes at any time without changing the scope or price of the Contract.‌ Contract. If County-initiated changes or changes in laws or government regulations affect price, the Subrecipient’s ability to deliver services, or the project schedule, the Subrecipient will give County written notice no later ten (10) days from the date the law or regulation went into effect or the date the change was proposed and Subrecipient was notified of the change. Such changes shall be agreed to in writing and incorporated into a Contract amendment. Said amendment shall be issued by the County-assigned Contract Administrator, shall require the mutual consent of all Parties, and may be subject to approval by the County Board of Supervisorssupervisors. Nothing herein shall prohibit the Subrecipient from proceeding with the work as originally set forth or as previously amended in this Contract. County of Orange Page 17 of 45 KRA Corporation Orange County Community Resources Contract No.: 18-28-0061-OS

Appears in 1 contract

Samples: cams.ocgov.com

Time is Money Join Law Insider Premium to draft better contracts faster.