Analysis Scenarios 2010 Baseline and Preferred SCS Sample Clauses

Analysis Scenarios 2010 Baseline and Preferred SCS. A 2010 baseline scenario was first constructed with 2010 population and baseline travel behavior data of the five study MPOs. The baseline scenario was to be compared to results according to the Preferred SCSs of the five MPOs. The projected daily vehicle miles traveled for motorized modes, and the annual or daily number of trips for transit, walking, and cycling based on land use strategies of the SCSs were used to calculate results for the preferred SCSs scenario.
AutoNDA by SimpleDocs

Related to Analysis Scenarios 2010 Baseline and Preferred SCS

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Baseline For purposes of measuring a reduction in net tax revenue, the interim final rule measures actual changes in tax revenue relative to a revenue baseline (baseline). The baseline will be calculated as fiscal year 2019 (FY 2019) tax revenue indexed for inflation in each year of the covered period, with inflation calculated using the Bureau of Economic Analysis’s Implicit Price Deflator.163 FY 2019 was chosen as the starting year for the baseline because it is the last full fiscal year prior to the COVID– 162 See, e.g., Tax Policy Center, How do state earned income tax credits work?, https:// xxx.xxxxxxxxxxxxxxx.xxx/xxxxxxxx-xxxx/xxx-xx- state-earned-income-tax-credits-work/ (last visited May 9, 2021).

  • Preferred Provider - Prescription Drugs The Board shall provide, through the Xxxxx County Council of Governments, a preferred provider drug program that, if the employee chooses to utilize, will include the following:

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Hybrid Loop A Loop composed of both fiber optic cable and copper wire or cable. An FTTP Loop is not a Hybrid Loop.

  • Focused Evaluation The Focused Evaluation is used when a teacher is not evaluated using the Comprehensive Evaluation process, and will include evaluation of one of the eight state criteria (student growth impact required). If a non-provisional teacher has scored at Proficient or higher the previous year, they may be moved to Focused Evaluation. The teacher may remain on the Focused Evaluation for five (5) years before returning to the Comprehensive Evaluation. The teacher or the evaluator can initiate a move from the Focused to the Comprehensive Evaluation. A decision to move a teacher from a Focused to a Comprehensive Evaluation must occur by December 15.

  • Measurements and Dimensions Before ordering material or doing work that is dependent upon coordination with building conditions, the Contractor shall verify all dimensions, elevations, grades, and pitch by taking measurements at the building and shall be responsible for the correctness of same. Any discrepancies between the drawings and/or specifications and the existing conditions shall be referred to the Design Professional for additional instructions before any work affected thereby is begun.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Hybrid Loops Sprint will provide CLEC access to Hybrid Loops for the provision of narrowband services as provided below. Sprint is not required to provide unbundled access to the packet switched features, functions, and capabilities of its Hybrid Loops.

Time is Money Join Law Insider Premium to draft better contracts faster.