Application for Grid Connection Sample Clauses

Application for Grid Connection. Party B shall submit the application for Grid connection to Dispatching Agency 15 days prior to the Date of Initial Connection of the Power Plant (unit). The application for Grid connection shall include the basic information of the equipments for this Grid connection, the acceptance, and the commission plan and schedule of the Power Plant (unit) for Grid connection etc. with all the documents set out in Clause 5.5 of this Agreement attached.
Application for Grid Connection. Party B shall submit the Connection Application to Party A 60 days prior to the Initial Connection Date of the Power Plant (units), which shall include basic information and the acceptance results of the facilities to be connected, the commissioning schedule and plan for the Power Plant (units), etc., and shall be attached with all documents set out in Clause 5.5 hereof.

Related to Application for Grid Connection

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • DISCONNECTION OF SUPPLY 14.1 When can we arrange for disconnection? (a) you do not pay your bill by the pay-by date and, if you are a residential customer, you: (i) fail to comply with the terms of an agreed payment plan; or (ii) do not agree to an offer to pay the bill by instalments, or having agreed, you fail to comply with the instalment arrangement; (b) you do not provide a security deposit we are entitled to require from you; or (c) you do not give access to your premises to read a meter (where relevant) for 3 consecutive meter reads; or (d) you fail to give us safe and unhindered access to the premises as required by clause 11 or any requirements under the energy laws; or (e) there has been illegal or fraudulent use of energy at your premises in breach of clause 16 of this contract; or (f) we are otherwise entitled or required to do so under the Rules or by law.

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.