Approval of Standard Design Poles Sample Clauses

Approval of Standard Design Poles. The Franchise may at any time request that a new or additional type of Light Pole, Utility Pole, or Stand-Alone Pole be deemed a Standard Design Pole by submitting an application to the Director. If the Director determines that the proposed design and specifications meet the City’s applicable safety standards and aesthetic guidelines, the Director shall designate the proposed new type as a Standard Design Pole and Exhibit A shall be amended accordingly. The Director shall have the discretion to approve a new type of Standard Design Pole that would be applicable only for installation in limited or designated areas of the City that are specified by the Director at the time such new type of Standard Design Pole is approved.
AutoNDA by SimpleDocs

Related to Approval of Standard Design Poles

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Application Approval Our representative will notify you (or one of you, if there are co-applicants) of the Application approval, execute the Lease agreements for signature prior to occupancy, and, once complete, credit the application deposit of all applicants toward the required security deposit.

  • FAA APPROVAL This Agreement may be subject to approval of the FAA. If the FAA disapproves this Agreement, it will become null and void, and both Parties will bear their own expenses relative to this Agreement, up to the date of disapproval.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Design Standards Most recent edition of the “Owner’s Design Standards,” including any partial updates as may be directed by the Owner.

Time is Money Join Law Insider Premium to draft better contracts faster.