Approved Australian Industry Participation Plan. [Drafting note: Australian industry participation requirements may apply to grants over $20 million. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry that an AIP Plan is required. An example clause is below] Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 of this Schedule 2. Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxx. Implementation Report a report provided to ARENA in accordance with item 2(d) to 2(f) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report. (a) The Recipient must comply with the AIP Plan. (b) If any conflict arises between any part of the AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict. (c) The AIP Plan must not be construed as limiting the Recipient‟s obligations to comply with the requirements of this Agreement. (d) The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. [Drafting note: Recipients should be required to provide a single Implementation Report on their implementation of the AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate] (e) Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection. (f) Where ARENA rejects the Implementation Report, the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA. (g) The Recipient consents to ARENA or any other Commonwealth agency: (i) publishing the executive summary of its AIP Plan; (ii) publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and (iii) publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement. (h) This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting note: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement]
Appears in 1 contract
Samples: Funding Agreement
Approved Australian Industry Participation Plan. [Drafting note: Australian industry participation requirements may apply to grants over $20 millionmillion or to major public or private project that has an estimated capital expenditure of AUD $500 million or more. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry Innovation and Science that an AIP Plan is required. An example clause is below.] Australian Industry Participation Plan or AIP Plan the Australian Industry Participation Authority. Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 1 of this Schedule 23 (Major Projects). Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxxsite. xxxxx://xxx.xxxxxxxx.xxx.xx/regulation-and-standards/australian- industry-participation Implementation Report a report provided to ARENA in accordance with item 2(d(d) to 2(f(f) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report.
(a) Once the AIP Authority has approved the Recipient’s AIP plan, the Recipient’s must provide ARENA with a copy of:
(i) the Approved AIP plan; and
(ii) the Certificate of Approval.
(b) The Recipient must comply with the Approved AIP Plan.
(bc) If any conflict arises between any part of the Approved AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict.
(cd) The Approved AIP Plan must not be construed as limiting the Recipient‟s Recipient’s obligations to comply with the requirements of this Agreement.
(d) The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. [Drafting note: Recipients should be required to provide a single Implementation Report on their implementation of the AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate]
(e) Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection.
(f) Where ARENA rejects the Implementation Report, the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA.
(g) The Recipient consents to ARENA or any other Commonwealth agency:
(i) publishing the executive summary of its AIP Plan;
(ii) publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and
(iii) publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement.
(h) This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting note: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement]
Appears in 1 contract
Samples: Funding Agreement
Approved Australian Industry Participation Plan. [Drafting note: Australian industry participation requirements may apply to grants over $20 millionmillion or to major public or private project that has an estimated capital expenditure of AUD $500 million or more. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry Innovation and Science that an AIP Plan is required. An example clause is below.] Australian Industry Participation Plan or AIP Plan the Australian Industry Participation Authority. Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 5 of this Schedule 22 (Major Projects). Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxxsite. xxxxx://xxx.xxxxxxxx.xxx.xx/xxxxxxxxxx-xxx- standards/australian-industry-participation Implementation Report a report provided to ARENA in accordance with item 2(d(d) to 2(f(f) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report.
(a) Once the AIP Authority has approved the Recipient’s AIP plan, the Recipient’s must provide ARENA with a copy of:
(i) the Approved AIP plan; and
(ii) the Certificate of Approval.
(b) The Recipient must comply with the Approved AIP Plan.
(bc) If any conflict arises between any part of the Approved AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict.
(cd) The Approved AIP Plan must not be construed as limiting the Recipient‟s Recipient’s obligations to comply with the requirements of this Agreement.
(de) The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. [Drafting note: Recipients should be required to provide a single Implementation Report on their implementation of the Approved AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate]account
(ef) Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection.
(fg) Where ARENA rejects the Implementation Report, the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA.
(gh) The Recipient consents to ARENA or any other Commonwealth agency:
(i) publishing the executive summary of its Approved AIP Plan;
(ii) publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and
(iii) publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement.
(h) This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting note: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement]
Appears in 1 contract
Samples: Funding Agreement
Approved Australian Industry Participation Plan. [Drafting noteNote: Australian industry participation requirements may apply to grants over $20 million. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry that an AIP Plan is required. An example clause is below] . If the clause is included, clause 30 (Survival) will be amended to include a reference to this clause 4.11.]
(a) In this clause 4.11 except where the contrary intention is expressed, the following definitions are used: Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 of this Schedule 27. Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxxxxxx://xxx.xxxxxxxx.xxx.xx/xxx. Implementation Report a report provided to ARENA in accordance with item 2(dclauses 4.11(e) to 2(f4.11(g) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report.
(ab) The Recipient must comply with the AIP Plan.
(bc) If any conflict arises between any part of the AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict.
(cd) The AIP Plan must not be construed as limiting the Recipient‟s Recipient’s obligations to comply with the requirements of this Agreement.
(de) The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. frame]. [Drafting noteNote: Recipients should be required to provide a single Implementation Report on their implementation of the AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date commencement of this Agreement would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate.]
(ef) Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection.rejection.
(fg) Where ARENA rejects has rejected the Implementation ReportReport pursuant to clause 4.11(f), the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA.issued under clause 4.11(f).
(gh) The Recipient consents to ARENA or any other Commonwealth agency:
(i) publishing the executive summary of its AIP Plan;
(ii) publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and
(iii) publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement.
(h) This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting noteNote: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement.]
Appears in 1 contract
Samples: Funding Agreement
Approved Australian Industry Participation Plan. [Drafting note: Australian industry participation requirements may apply to grants over $20 million. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry that an AIP Plan is required. An example clause is below] Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 of this Schedule 2. Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxx. Implementation Report a report provided to ARENA in accordance with item 2(d) to 2(f) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report.
(a) . The Recipient must comply with the AIP Plan.
(b) . If any conflict arises between any part of the AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict.
(c) . The AIP Plan must not be construed as limiting the Recipient‟s Recipient’s obligations to comply with the requirements of this Agreement.
(d) . The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. [Drafting note: Recipients should be required to provide a single Implementation Report on their implementation of the AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate]
(e) ] Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection.
(f) . Where ARENA rejects the Implementation Report, the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA.
(g) . The Recipient consents to ARENA or any other Commonwealth agency:
(i) : publishing the executive summary of its AIP Plan;
(ii) ; publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and
(iii) and publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement.
(h) . This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting note: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement]] [Drafting note: The Scheme accreditation requirement applies to Building Work that is indirectly funded by the Australian Government where: the head contract for Building Work is $4 million (GST inclusive) or more] The Scheme means the Scheme described at Section 43 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth) and specified in the Fair Work (Building Industry - Accreditation Scheme) Regulation 2016 (Cth). Builder has the meaning given in Section 43(8) of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth).
Appears in 1 contract
Samples: Funding Agreement
Approved Australian Industry Participation Plan. [Drafting noteNote: Australian industry participation requirements may apply to grants over $20 million. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry that an AIP Plan is required. An example clause is below. If the clause is included, clause 30 (Survival) will be amended to include a reference to this clause 4.11.] In this clause 4.11 except where the contrary intention is expressed, the following definitions are used: Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 of this Schedule 27. Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxxxxxx://xxx.xxxxxxxx.xxx.xx/xxx. Implementation Report a report provided to ARENA in accordance with item 2(dclauses 4.11(e) to 2(f4.11(g) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report.
(a) . The Recipient must comply with the AIP Plan.
(b) . If any conflict arises between any part of the AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict.
(c) . The AIP Plan must not be construed as limiting the Recipient‟s Recipient’s obligations to comply with the requirements of this Agreement.
(d) . The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. [Drafting noteNote: Recipients should be required to provide a single Implementation Report on their implementation of the AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date commencement of this Agreement would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate]
(e) .] Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection.
(f) . Where ARENA rejects has rejected the Implementation ReportReport pursuant to clause 4.11(f), the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA.
(g) issued under clause 4.11(f). The Recipient consents to ARENA or any other Commonwealth agency:
(i) : publishing the executive summary of its AIP Plan;
(ii) ; publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and
(iii) and publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement.
(h) This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting noteNote: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement].] The Recipient, in connection with the Project, must: comply with the WHS Law; and not do or allow to be done, or omit or allow to be omitted anything which may result in ARENA being in breach of the WHS Law. Without limiting the generality of clause 4.12(a), the Recipient must ensure in connection with the Project, so far as is reasonably practicable: the health and safety of workers carrying out activities in connection with the Project; that its workers, and the workers who in carrying out activities in connection with the Project are influenced or directed by the Recipient, take reasonable care while carrying out activities in connection with the Project; the provision and maintenance of safe systems of work; that workers: receive the necessary information, training, instruction and supervision in order to comply with the WHS Law and any rules, regulations, policies and guidelines issued from time to time by the Recipient; and are aware of, and comply with, any requirement or directive relating to work health and safety which is issued by the Recipient from time to time, and any directive relating to work health and safety which is issued by ARENA or the appropriate regulatory agency; and the health and safety of other persons is not put at risk from activities in connection with the Project. The Recipient must immediately notify ARENA of any notifiable incidents or accidents (being an incident which is notifiable under WHS Law), injuries or damage to property of a serious nature that occurs in connection with the Project. In relation to any incident notified to ARENA under clause 4.12(c), the Recipient must provide to ARENA: an investigation report containing findings on the causes and effects of, and corrective and preventative actions arising from, any accident, notifiable incident, injury or damage to property notified to ARENA under clause 4.12(c); and following the completion of an investigation report in accordance with clause 4.12(d)(i), a monthly report identifying the status of any preventative or corrective actions identified in that investigation report. The Recipient must permit and must procure such further permission as may be deemed necessary for the Recipient and ARENA (or any person nominated by it) to inspect, examine, interview and take statements from the Recipient’s Personnel as it deems fit (acting reasonably) for the purposes of determining the causes and effects of any notifiable incident or accident, injury or damage to property of a serious nature. The Recipient must, so far as is reasonably practicable: consult, co-operate and co-ordinate activities with ARENA to ensure compliance with the WHS Law in connection with the Project, including taking reasonable steps to facilitate and participate in any meetings, furnish and maintain current information and to take any other steps agreed between ARENA and the Recipient; consult with its workers to ensure compliance with WHS Law in connection with the Project; and consult, co-operate and co-ordinate activities with any other person who has a duty in relation to the same matter under the WHS Law involved in or connected to the Project (including all subcontractors), to ensure compliance with the WHS Law, including taking reasonable steps to facilitate subcontractor participation in any meetings and training, provision and maintenance of current work health and safety information and to take any other steps agreed between the parties and those other persons. In undertaking any activities under this Agreement, ARENA will not be commissioning any construction projects in connection with the Project or for the purposes of Part 6 of the WHS Regulations. Variation to the Project If the Recipient wants to seek a variation to the Project including postponement of the completion date for a Milestone as specified in Schedule 2, the Recipient must submit a notice to ARENA in writing setting out: details of the proposed variation to the Project or relevant Milestone completion date and reasons for the request; in relation to requests to postpone a Milestone completion date, reasons why the Project cannot be performed in such a way as to meet the given date; and the impact the proposed variations will have on: the Budget; the Milestones; and the Recipient Contributions and Other Contributions. ARENA will give the Recipient a written notice accepting or rejecting the Recipient's request within 30 Business Days after receiving the request. If ARENA accepts the Recipient's request, the parties will vary this Agreement in accordance with clause 32.3. Contributions
Appears in 1 contract
Samples: Funding Agreement
Approved Australian Industry Participation Plan. [Drafting note: Australian industry participation requirements may apply to grants over $20 millionmillion or to major public or private project that has an estimated capital expenditure of AUD $500 million or more. An Australian industry participation clause will be included where ARENA is advised by the Department of Industry Innovation and Science that an AIP Plan is required. An example clause is below.] Australian Industry Participation Plan or AIP Plan the Australian Industry Participation Authority Australian Industry Participation Plan or AIP Plan the plan in referenced in item 2 5 of this Schedule 23 (Major Projects). Australian Industry Participation Plans: User Guide or, AIP Plans: User Guide the Australian Industry Participation Plans: User Guide for developing an AIP Plan and Implementation Report published by the Department of Industry which can be obtained from the internet site xxxx://xxx.xxxxxxxxxx.xxx.xx/xxxsite. xxxxx://xxx.xxxxxxxx.xxx.xx/xxxxxxxxxx-xxx- standards/australian-industry-participation Implementation Report a report provided to ARENA in accordance with item 2(d(d) to 2(f(f) (inclusive). Implementation Report Requirements the requirements for an Implementation Report set out in the AIP Plans: User Guide for developing an AIP Plan and Implementation Report.
(a) Once the AIP Authority has approved the Recipient’s AIP plan, the Recipient’s must provide ARENA with a copy of:
(i) the Approved AIP plan; and
(ii) the Certificate of Approval.
(b) The Recipient must comply with the Approved AIP Plan.
(bc) If any conflict arises between any part of the Approved AIP Plan and any other part of this Agreement, the other part of this Agreement prevails to the extent of the conflict.
(cd) The Approved AIP Plan must not be construed as limiting the Recipient‟s Recipient’s obligations to comply with the requirements of this Agreement.
(de) The Recipient must provide ARENA with an Implementation Report that meets the Implementation Report Requirements within [insert time frame]. [Drafting note: Recipients should be required to provide a single Implementation Report on their implementation of the Approved AIP Plan under the Agreement. The appropriate time for providing the Implementation Report will depend on the term of the Agreement and the nature of the activity being performed under the Agreement, taking into account the areas that are to be addressed in the Implementation Report. As a general statement, for a longer term Agreement, within 60 days of the first anniversary of the Commencement Date would be appropriate. For shorter term contracts (e.g. less than 12 months), 30 days prior to the completion of the Agreement would be appropriate]account
(ef) Where ARENA considers that the Implementation Report does not meet the Implementation Report Requirements, ARENA may by written notice to the Recipient reject the Implementation Report. Where ARENA rejects the Implementation Report, ARENA will provide the Recipient with reasons for the rejection.
(fg) Where ARENA rejects the Implementation Report, the Recipient must provide ARENA with the Implementation Report, amended to address the reasons for the rejections advised by ARENA and that otherwise meets the Implementation Report Requirements within 10 Business Days of the date of the notice issues by ARENA.
(g) The Recipient consents to ARENA or any other Commonwealth agency:
(i) publishing the executive summary of its AIP Plan;
(ii) publicising or reporting on the Recipient's performance in relation to the AIP Plan and level of compliance with the AIP Plan; and
(iii) publicising or reporting on any information contained in the AIP Plan or AIP Implementation Report under this Agreement.
(h) This item 2 of Schedule 2 survives the termination or expiry of this Agreement. [Drafting note: Drafters should confirm that the AIP Plan and Implementation Report are not included as confidential information of the Recipient under this Agreement]
Appears in 1 contract
Samples: Funding Agreement