ArticulationAgreement Timelines Sample Clauses

ArticulationAgreement Timelines. E~ ~;; '.X)D[) ~oD5 Date of Review VY'tlLff. ~C>O ~ Date of Outcomes Evaluation Da~~~n ~O I0
AutoNDA by SimpleDocs

Related to ArticulationAgreement Timelines

  • Project Timeline The Project Timeline establishes a start and end date for each Phase of the Project. Developed during the Initiate & Plan Stage and revised as mutually agreed to, if needed, the timeline accounts for resource availability, business goals, size and complexity of the Project, and task duration requirements.

  • Attachment A, Scope of Services The scope of services is amended as follows:

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

  • ATTACHMENT E BUSINESS ASSOCIATE AGREEMENT This Business Associate Agreement (“Agreement”) is entered into by and between the State of Vermont Agency of Human Services, operating by and through its Department of Vermont Health Access (“Covered Entity”) and OptumInsight, Inc. (“Business Associate”) as of June 6, 2014 (“Effective Date”). This Agreement supplements and is made a part of the contract/grant to which it is attached. Covered Entity and Business Associate enter into this Agreement to comply with standards promulgated under the Health Insurance Portability and Accountability Act of 1996 (“HIPAA”), including the Standards for the Privacy of Individually Identifiable Health Information, at 45 CFR Parts 160 and 164 (“Privacy Rule”), and the Security Standards, at 45 CFR Parts 160 and 164 (“Security Rule”), as amended by Subtitle D of the Health Information Technology for Economic and Clinical Health Act (HITECH), and any associated federal rules and regulations. The parties agree as follows:

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • PROGRESS SCHEDULE The Contractor, within ten (10) working days of receiving notice of the award of the contract, shall prepare and submit for the State's and Architect's information an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

  • SCOPE OF SERVICES/CASE HANDLING A. Upon execution by Xxxxxx, Attorneys are retained to provide legal services for the purpose of seeking damages and other relief in the Litigation. Client agrees that Xxxxxx may choose to associate additional law firm(s) and/or lawyer(s) to represent Client in connection with the investigation and prosecution of the rights Client has as a purchaser of publically traded securities of Xxxxxx, and Client understands that such representation shall be on the same terms as those described in this agreement.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.