Backfill, Native and Stone Sample Clauses

Backfill, Native and Stone. Average distance between surface grade and the top of the pipe envelope (12-inch cover over the pipe) measured between manholes for gravity sewers and 100-foot increments for force mains.
AutoNDA by SimpleDocs

Related to Backfill, Native and Stone

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • PROMOTIONS AND STAFF CHANGES 22.1 Job Postings

  • Project Team Cooperation Partnering 1.1.3 Constitutional Principles Applicable to State Public Works Projects.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • PROMOTIONS AND SENIORITY Promotion in the VFRS shall be based on eligibility and on the candidate having the ability to perform the essential duties of the rank at the time of promotion. In cases where two candidates are relatively equal in their aggregate scores, the more senior member in the division will be ranked higher for the purpose of both promotion and acting assignments.

  • Occupational First Aid Requirements and Courses (a) The Union and the Employer agree that First Aid Regulations made pursuant to the Workers' Compensation Act shall be fully complied with.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Medical Facilities Space shall be designated to permit an ill or injured employee to lie down until disposition of need. Cots, beds, stretchers, or pads are acceptable for this purpose. Space shall not be used for a storage area or any other purpose that would make it unavailable for immediate use in rendering first aid care.

  • Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures.

Time is Money Join Law Insider Premium to draft better contracts faster.