Base System Sample Clauses

Base System. Tyler Software, as listed in Exhibit AInvestment Summary above, running in the Tyler hosting center.
AutoNDA by SimpleDocs
Base System. Effective on the Data Processing Operational Date, the following host-based application processing modules (the “Base System”) will be on-line and available for Customer access from Customer’s terminals as set forth in Section I(b) and Section I(c) of this Schedule A. Central Information File ITI CIS 101-000 Demand Deposit Accounting System ITI DDA 102-000 Express Exception Item System ITI EIM 102-103 Savings Accounting System ITI SAV 103-000 Retirement Reporting Module ITI RRM 103-101 Certificate of Deposit Accounting System ITI COD 104-000 Loan Accounting System ITI LAS 105-000 General Ledger Accounting System ITI FMS 151-000 Holding Company Module ITI HCM 151-101 Item Entry System ITI IES 106-000 Accounts Payable System ITI APS 702-000 Automated Credit Reporting Module ITI CRM 105-101 ATM File Transfer Module ITI AFT 220-000 Asset/Liability Management Module ITI ALM 152-103 Bond Accounting System ITI BAS 153-003 Check Reconcilement System (internal official items only) ITI CRS 350-000 Currency Transaction System ITI CTS 320-000 Data Communications File Transfer Module ITI DFT 221-000 Delinquent Child Support Module ITI DCSM 101-506 Federal Call Reporting Module ITI FCR 390-003 Fixed Assets System ITI FAS 400-000 On-line Collection ITI OLC 105-203 Paperless Item Module ITI PIM 380-000 Platform Transfer Module ITI PTM 101-100 Platform Transfer Interface for CFI Deposit Pro ITI PMCD 101-105 Platform Transfer Interface for CFI Laser Pro ITI PMCB 101-101 Premier II Graphical User Interface ITI Signature Management Module ITI SMM 107-116 Output Management System Aurum OMS 000-00
Base System software for handling online sales via different sales channels available in the SaaS (Software as a Service) model and provided by BaseLinker, available at xxxxx://xxxx.xxx/ after logging in to the user’s account.
Base System. This shall comprise: - processor(s) (CPU) and multi gateway components for the minimum functions required for telephone traffic, excluding peripherals. - operator positions, - power supplies, excluding backup batteries, - equipment for remote diagnostics, - base software, excluding any enhancements (added functions) to this software. - operating system(s) and communications protocol(s) that form an integral part of the base system.
Base System 

Related to Base System

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Normal Work Week The normal work week shall be thirty-seven and one-half (37 1/2) hours, and the normal daily hours of work shall be seven and one-half (7 1/2) hours, exclusive of a meal period. The normal work week shall be Monday through Friday and the normal workday shall be scheduled between 7:00 a.m. and 6:00 p.m.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Customer Equipment Customer represents and warrants that it owns or has the legal right and authority, and will continue to own or maintain the legal right and authority during the term of this Agreement, to place and use the Customer Equipment as contemplated by this Agreement. Customer further represents and warrants that its placement, arrangement, and use of the Customer Equipment in the Internet Data Centers complies with the Customer Equipment Manufacturer's environmental and other specifications.

  • Standard Work Week The standard work week for full-time employees covered by this Agreement shall be forty (40) hours, exclusive of the time allotted for meal periods, consisting of five (5) consecutive work days followed by two (2) consecutive days off. The week shall commence with the shift that includes 12:01 A.M. Sunday of each calendar week and end at the start of the shift that includes 12:00 midnight the following Saturday. The Employer retains the right to modify the work schedules to meet operational needs.