Baseline Characteristics and Preliminary Responsiveness Classification Sample Clauses

Baseline Characteristics and Preliminary Responsiveness Classification. ‌ Of the 83 patients approached for study enrollment, 58 participated at baseline, 57 of which returned at month one for preliminary responsiveness classification. Thirty-two patients (55.2% of patients evaluated at baseline) were classified as preliminary responders. The remaining 25 patients (43.1% of patients evaluated at baseline) were classified as BH4 non-responders. Characteristics of patients at baseline and after one month BH4 therapy are displayed in Table 4-1. Mean plasma phenylalanine to tyrosine ratios were significantly different between the two groups at baseline (preliminary responders: 12.9 ± 9.8, non-responders: 20.4 ± 14.7; p=0.033) and after one month of BH4 therapy (preliminary responders: 6.4 ± 6.7, non- responders: 24.1 ± 15.9; p<0.0001). These differences were driven by plasma phenylalanine concentrations since plasma tyrosine concentrations did not differ between the groups at baseline (preliminary responders: 50.5 ± 15.5 μmol/L, non-responders: 52.1 ± 22.4; p=0.755) or month one (preliminary responders: 46.1 ± 21.4, non-responders: 48.4 ± 26.3; p=0.720).
AutoNDA by SimpleDocs

Related to Baseline Characteristics and Preliminary Responsiveness Classification

  • Characteristics of the level (a) A person employed as a Social and community services employee level 6 will operate under limited direction from senior employees or management and undertake a range of functions for which operational policies, practices and guidelines may need to be developed.

  • Additional Service Characteristics 3.12 The technical specification of the Bitstream 2a Service is set out in Appendix B.

  • Demographic, Classification and Wage Information XXXXXX agrees to coordinate the accumulation and distribution of demographic, classification and wage data, as specified in the Letter of Understanding dated December 14, 2011, to CUPE on behalf of Boards of Education. The data currently housed in the Employment Data and Analysis Systems (EDAS) will be the source of the requested information.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Classification Specifications The Employer agrees to supply the President of the Union or his/her designate with the classification specifications for those classifications in the Bargaining Unit.

  • CHANGE IN CLASSIFICATION SPECIFICATIONS Section 1. The Employer shall notify the Union of intended classification studies.

  • New Job Classifications 11.1 Whenever the Company determines it appropriate to create a new job classification in the bargaining unit, it shall proceed as follows.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • ADMISSION REQUIREMENTS FOR SENIOR COLLEGE PROGRAM  The A.A. degree and a minimum GPA of 2.00  Grade of C or better in a credit-bearing mathematics course worth three or more credits*  Grade of C or better in freshman composition, its equivalent, or a higher-level English course* *(Effective 10/1/08, per University policy) Students who wish to transfer but do not meet all of the above requirements or are unable to enroll within two years after graduation will receive admission consideration under our standard transfer credit policies. Total transfer credits granted toward the baccalaureate degree: 60 Total additional credits required at the senior college to complete baccalaureate degree: 60 Total credits required for the B.A. in Global History: 120

  • CLASS SIZE/STAFFING LEVELS The board will make every effort to limit FDK/Grade 1 split grades where feasible. APPENDIX A – RETIREMENT GRATUITIES

Time is Money Join Law Insider Premium to draft better contracts faster.