Basic Setting Sample Clauses

Basic Setting. Cut Speed: The speed at which the laser head moves with the laser on. In Varying Speed mode, it is the maximum speed at which the laser head moves with the laser on; Power: The laser power during cutting. You can set it between 1-100%; Cut Reserve: Before finishing cutting a closed loop, turn off the laser a little earlier to avoid the whole part being cut off;
AutoNDA by SimpleDocs
Basic Setting. Speed: The speed at which the laser head moves during engraving; Power: The laser power during engraving. You can set it between 1-100%; Precision: The engraving precision in Y-axis in DPI (Dot Per Inch); Minimum Power: The minimum value of the laser power setting, when the system tries to compensate laser power for different speed; Optimized: Engrave the graphics in the best path; Vertical Engraving: Engrave vertically instead of horizontally; Uni-Directional: The laser will be only when the laser head moves from left to right.(Apply to very fine graphics, such as below 3mm text and precision above E level shape code); Return Speed: The return speed when the laser moves back from right to left in Uni-Directional mode with the laser being off; Stamp Mode: In stamp mode, you will see slope at the edge of engraved graphic.Also called slope mode. To grantee the better result of slope, it better set the engrave power ad 100%; Pitch: The length of slope in Stamp Mode. You can set it between 0-4mm; Xxxx: Control on the blowing for the device, select the option, it means that the engraving have to being blowing, otherwise, it means not to blow; Xxxx delay:The time of xxxx switch changes the status. (2).Advanced Setting (Fig.3-6-34) Laser head setting: used to select which laser head need to use during the operation, it‟s effective only for the device with double head, if for single-head device, please select the “dual laser head”or “left laser head”;

Related to Basic Setting

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Interconnection Customer Payments Not Taxable The Parties intend that all payments or property transfers made by the Interconnection Customer to the Participating TO for the installation of the Participating TO's Interconnection Facilities and the Network Upgrades shall be non-taxable, either as contributions to capital, or as a refundable advance, in accordance with the Internal Revenue Code and any applicable state income tax laws and shall not be taxable as contributions in aid of construction or otherwise under the Internal Revenue Code and any applicable state income tax laws.

  • CAISO ACA Charge The CAISO ACA Charge is the product of the Unit’s Billable MWh for the Billing Month and the applicable annual charge for short-term sales under 18 CFR Section 382.201 of the FERC Regulations. Schedule C Variable Cost Payment for All Conditions Part 5 for Biomass Generation Units For each month and each Unit, the Variable Cost Payment for Billable MWH from the Unit pursuant to Nonmarket Transaction during that Month shall be the amount calculated in accordance with the following formula: Variable Cost Payment = A.

  • Tariff Elimination 1. Except as otherwise provided in this Agreement, no Party may increase any existing customs duty, or adopt any new customs duty, on an originating good.

  • Electricity Charges The licensee herein shall pay the electricity bills directly for energy consumed on the licensed premises and should submit original receipts to Licensor indicating that the electricity bills are paid.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • DELIVERY TERMS AND TRANSPORTATION CHARGES Deliverables shall be shipped F.O.B. point of delivery unless otherwise specified in the Supplemental Terms and Conditions. Unless otherwise stated in the Offer, the Contractor’s price shall be deemed to include all delivery and transportation charges. The City shall have the right to designate what method of transportation shall be used to ship the deliverables. The place of delivery shall be that set forth the purchase order.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!