BODE Index Sample Clauses

BODE Index. ‌ The BODE index is a multidimensional measure that has been reported to be predictive of risk of death from any cause and from respiratory causes [46,47]. It combines four measures frequently used in COPD studies as a composite score: body-mass index (BMI), obstruction (FEV1 % predicted), dyspnea, usually characterized using the mMRC survey score, and exercise capacity, as determined using the 6MWD test. Each component is graded and a score of 0 to 10 is obtained as indicated in the table below. The BODE Index will be calculated and reported in the final study report. Table. Determination of the BODE Index Score. Points for BODE Index Score 0 1 2 3 BMI (kg.m-2) >21 <21 FEV1 % predicted >00 00-00 00-00 <35 MMRC 0-1 2 3 4 6MWD (m) >350 250-349 150-249 <149
AutoNDA by SimpleDocs

Related to BODE Index

  • Level Five Binding Arbitration (Any grievance filed on or after July 1, 2006)

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Linear Interpolation Where Linear Interpolation is specified as applicable in respect of an Interest Period in the applicable Final Terms, the Rate of Interest for such Interest Period shall be calculated by the Agent by straight line linear interpolation by reference to two rates based on the relevant Reference Rate (where Screen Rate Determination is specified as applicable in the applicable Final Terms) or the relevant Floating Rate Option (where ISDA Determination is specified as applicable in the applicable Final Terms), one of which shall be determined as if the Designated Maturity were the period of time for which rates are available next shorter than the length of the relevant Interest Period and the other of which shall be determined as if the Designated Maturity were the period of time for which rates are available next longer than the length of the relevant Interest Period provided however that if there is no rate available for a period of time next shorter or, as the case may be, next longer, then the Agent shall determine such rate at such time and by reference to such sources as it determines appropriate.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • MUSIC USAGE RETURN 15.1 The Licensee must, for the duration of the Agreement and on a quarterly basis, submit to SAMRO the following information regarding each and every Work of Music Performed at the Premises: the name of the Work of Music; the name(s) of each composer; the name(s) of the arranger; the name(s) of the performer; the name(s) of the publisher; and the number of times each Work of Music was Performed.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Monthly Billing The electric service charge shall be computed in accordance with the monthly billing in the applicable standard service tariff. Customers receiving electric service under residential and small nonresidential schedules 1, 2, 3, 15, 23 or 23B shall be financially credited for such net energy with a cumulative kilowatt-hour credit. The credit will be deducted from the customer’s kilowatt-hour usage on the customer’s next monthly bill thus offsetting the customer’s next monthly bill at the full retail rate of the customer’s rate schedule. Customers receiving electric service under large nonresidential schedules 6, 6A, 6B, 8 or 10 must elect a compensation method to receive cumulative credits for the upcoming annualized billing period from one of the following options (large nonresidential customers must initial desired credit election): an average energy price, a seasonally differentiated energy price, or an average retail rate.

  • Alternate Billed Calls 1.1 The Parties will engage in settlements of intraLATA intrastate alternate-billed calls (e.g., collect, calling card, and third-party billed calls) originated or authorized by their respective Customers in accordance with an arrangement mutually agreed to by the Parties.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

Time is Money Join Law Insider Premium to draft better contracts faster.