BUILDING ACTIVITIES. 16.1 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the BUILDING CONTRACTOR immediately once the damage becomes evident. 16.2 All refuse and litter including cement bags and plastic bags must be collected daily and placed in bags and removed from the DEVELOPMENT regularly or placed in waste bins/containers securely covered when site is vacated. These bins/ containers are to be supplied by the BUILDING CONTRACTOR at the BUILDING CONTRACTOR's cost. The bins/ containers must be emptied and the contents removed from the Estate at appropriate intervals, but in any event, not less than once a week. The burning of rubbish and fires generally are not permitted under any circumstances. 16.3 The BUILDING CONTRACTOR shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF and must be removed on a weekly basis or as otherwise required by the DEVELOPER/HOA. 16.4 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the estate manager. 16.5 The BUILDING CONTRACTOR shall generally ensure that the ERF is at all times kept neat and free of litter or other unsightly waste. 16.6 If the BUILDING CONTRACTOR fails to keep the ERF in an acceptably tidy state or fails to have the rubble removed, then the DEVELOPER and/or the HOA shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble the costs whereof shall be for the account of the BUILDING CONTRACTOR. 16.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT or any surrounding area and the BUILDING CONTRACTOR is required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENT. 16.8 Throughout the construction/erection of the IMPROVEMENTS effective dust control measures must be implemented by the BUILDING CONTRACTOR. 16.9 All activities relating to the house construction must be confined to within the ERF boundary where construction is taking place. This relates to location of staff, placing of storage bins etc. 16.10 Unless written permission to encroach onto adjacent site(s)/xxxxx has been obtained from the adjacent site/erf owner(s) and lodged with the HOA: 16.10.1 a simple three stand wire fence must be erected on all the site boundaries other than the road boundary before building activities commence; and 16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites. 16.11 Written permission to encroach onto common areas must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced. 16.10 The BUILDING CONTRACTOR will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the BUILDING CONTRACTOR not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the BUILDING CONTRACTOR. The BUILDING CONTRACTOR will be denied access to the DEVELOPMENT until such costs have been paid in full. 16.11 Washing of vehicles and equipment will not be allowed on the DEVELOPMENT and must be carried out elsewhere. 16.12 No fires will be allowed on any part of the DEVELOPMENT. Fire extinguishers are required to be on the ERF site at all times. 16.13 If a store is placed on site it must be acceptable, adequate and secure, properly tied down (see clause 19 below) and placed on the ERF. If a corrugated iron structure is used it must be painted dark green. 16.14 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via the HOA to remove plant material where possible or to protect it during construction. The HOA reserves the right to replace plant material at the owner's expense should material be damaged. 16.15 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth which must be adequately secured. BUILDING CONTRACTORS will be held responsible should neighbours be affected by wind blown sand. 16.16 The BUILDING CONTRACTOR will be required to screen of the ERF with a 1,8m high dark green or black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA. A 6m wide access will be allowed on the roadside. 16.17 Owners and contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ No waste bins on site – R1 000.00 penalty. ▪ Waste bin not complying to regulations – R500.00 penalty. ▪ Overflowing waste bins – R500.00 penalty. ▪ Refuse dumped in Estate skip and/or other place within the estate – R1 000.00 penalty. ▪ Dumping building waste in estate skips – R1 500.00 penalty. ▪ Dumping excavation soil in an place other than the allocated area – R2 000.00 penalty ▪ ERF not kept in an acceptable tidy state – R500.00 per day.
Appears in 1 contract
BUILDING ACTIVITIES. 16.1 19.1 Prior to any construction work taking place on site, all missing erf pegs have to be re- instated and pointed out to the estate-building inspector. During this site meeting, a land surveyor’s certificate (confirming position of the pegs) has to be handed to the inspector, as well.
19.2 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the BUILDING CONTRACTOR Building Contractor immediately once the damage becomes evident.
16.2 19.3 All refuse and litter including cement bags and plastic bags must be collected daily and placed in bags and removed from the DEVELOPMENT Development regularly (at least once a week) or placed in waste bins/containers securely covered when site is vacated. These bins/ containers are to be bins(must have properly fitted lids) supplied by the BUILDING CONTRACTOR Building Contractor at the BUILDING CONTRACTOR's Building Contractor’s cost. The bins/ containers Without detracting from the generality of the a foregoing, the Building Contractor specifically acknowledges that all empty cement bags, plastic and other loose material must be emptied and the contents removed from the Estate at appropriate intervalsDevelopment so as not to contaminate the Vineyards, but in any event, not less than once a week. The burning of rubbish the dams and fires generally are not permitted under any circumstanceswetlands.
16.3 19.4 The BUILDING CONTRACTOR Building Contractor shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF and must be removed on a weekly basis or as otherwise required by the DEVELOPERDeveloper/HOA.
16.4 19.5 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the estate managerDeveloper.
16.5 19.6 The BUILDING CONTRACTOR Building Contractor shall generally ensure that the ERF Erf is at all times kept neat and free of litter or other unsightly waste.
16.6 19.7 If the BUILDING CONTRACTOR Building Contractor fails to keep the ERF Erf in an acceptably tidy state or fails to have the rubble removed, then the DEVELOPER Developer and/or the HOA shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble the costs whereof shall be for the account of the BUILDING CONTRACTOROwner/Building Contractor.
16.7 19.8 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT Development, including the Vineyards or any surrounding area and the BUILDING CONTRACTOR Building Contractor is required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENTDevelopment.
16.8 19.9 Throughout the construction/erection of the IMPROVEMENTS improvements effective dust control measures must be implemented by the BUILDING CONTRACTOR.Building Contractor
16.9 19.10 All activities relating to the house construction must be confined to within the ERF Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc.
16.10 Unless written permission to encroach onto adjacent site(s)/xxxxx has been obtained from the adjacent site/erf owner(s) and lodged with the HOA:
16.10.1 a simple three stand wire fence must be erected on all the site boundaries other than the road boundary before building activities commence; and
16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites.
16.11 Written permission to encroach onto common areas must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced.
16.10 19.11 The BUILDING CONTRACTOR Building Contractor will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the BUILDING CONTRACTOR Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the BUILDING CONTRACTORBuilding Contractor. The BUILDING CONTRACTOR Building Contractor will be denied access to the DEVELOPMENT until Development such costs have been paid in full.
16.11 19.12 Washing of vehicles and equipment will not be allowed on the DEVELOPMENT Development and must be carried out elsewhere.
16.12 19.13 No fires will be allowed on any part of the DEVELOPMENTDevelopment. Fire extinguishers are required to be on the ERF site at all times.
16.13 If a store is placed on site it must be acceptable, adequate and secure, properly tied down (see clause 19 below) and placed on the ERF. If a corrugated iron structure is used it must be painted dark green.
16.14 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via the HOA to remove plant material where possible or to protect it during construction. The HOA reserves the right to replace plant material at the owner's expense should material be damaged.
16.15 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth which must be adequately secured. BUILDING CONTRACTORS will be held responsible should neighbours be affected by wind blown sand.
16.16 The BUILDING CONTRACTOR will be required to screen of the ERF with a 1,8m high dark green or black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA. A 6m wide access will be allowed on the roadside.
16.17 Owners and contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ No waste bins on site – R1 000.00 penalty. ▪ Waste bin not complying to regulations – R500.00 penalty. ▪ Overflowing waste bins – R500.00 penalty. ▪ Refuse dumped in Estate skip and/or other place within the estate – R1 000.00 penalty. ▪ Dumping building waste in estate skips – R1 500.00 penalty. ▪ Dumping excavation soil in an place other than the allocated area – R2 000.00 penalty ▪ ERF not kept in an acceptable tidy state – R500.00 per day.
Appears in 1 contract
BUILDING ACTIVITIES. 16.1 18.1 Prior to any construction work taking place on Site, all missing erf pegs have to be re-instated and aland
18.2 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk must be mustbe protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the BUILDING CONTRACTOR Building Contractor immediately once the damage becomes evident.
16.2 18.3 All refuse and litter including refuse, litter, plastic bags, cement bags and plastic bags bags, packaging material etc must be collected daily and placed in bags and removed from the DEVELOPMENT Estate regularly (at least once a week) or placed in waste bins/containers securely covered when site is vacated. These bins/ containers are to be bins with properly fitted lids supplied by the BUILDING CONTRACTOR Building Contractor at the BUILDING CONTRACTOR's Building Contractor’s cost. The bins/ containers must be emptied and the contents removed from the Estate at appropriate intervals, but in any event, not less than once a week. The burning of rubbish and fires generally are not permitted under any circumstances.
16.3 The BUILDING CONTRACTOR shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF and must be removed on a weekly basis or as otherwise required by the DEVELOPER/HOA.
16.4 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the estate manager.
16.5 The BUILDING CONTRACTOR Building Contractor shall generally ensure that the ERF Erf is at all times kept neat and free of litter or other unsightly waste.
16.6 If the BUILDING CONTRACTOR fails to keep the ERF in an acceptably tidy state 18.4 The Building Contractor shall ensure that all building rubble is removed on a weekly basis or fails to have the rubble removed, then the DEVELOPER and/or the HOA shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble the costs whereof shall be for the account of the BUILDING CONTRACTOR.
16.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT or any surrounding area and the BUILDING CONTRACTOR is as otherwise required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENT.
16.8 Throughout the construction/erection of the IMPROVEMENTS effective dust control measures must be implemented by the BUILDING CONTRACTOR.
16.9 All activities relating to the house construction must be confined to within the ERF boundary where construction is taking place. This relates to location of staff, placing of storage bins etc.
16.10 Unless written permission to encroach onto adjacent site(s)/xxxxx has been obtained from the adjacent siteDeveloper/erf owner(s) and lodged with the HOA:
16.10.1 a simple three stand wire fence must be erected on all the site boundaries other than the road boundary before building activities commence; and
16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites.
16.11 Written permission to encroach onto common areas must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced.
16.10 The BUILDING CONTRACTOR will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the BUILDING CONTRACTOR Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof shall be claimed from the BUILDING CONTRACTORBuilding Contractor. The BUILDING CONTRACTOR Building Contractor will be denied access to the DEVELOPMENT Estate until such costs have been paid in full.
16.11 18.5 Excavation material/soil may not be dumped within the estate unless with express permission from the Developer and/or the HOA and as determined by the Developer and/or the HOA.
18.6 The Building Contractor will be expected to keep the appearance of his building Site neat and tidy at all times. Should the Building Contractor fail to keep the Erf in an acceptable state, the Developer and/or the HOA shall, without prejudice to its other rights, have the right to clean the Site the costs whereof shall be for the account of the Owner/Building Contractor.
18.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the Estate or any surrounding area. The Building Contractor shall make arrangements for disposing of materials at a spoil site off the Estate.
18.8 Throughout the construction/erection of the improvements effective dust control measures must be implemented by the Building Contractor
18.9 All construction activities must be confined to within the Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc.
18.10 Washing of vehicles and equipment will not be allowed on the DEVELOPMENT and must be carried out elsewhereEstate.
16.12 18.11 No fires will be allowed on any part of the DEVELOPMENTEstate. Fire extinguishers are required to be on the ERF site Site at all times.
16.13 If a store is placed on site it must be acceptable, adequate . Breach: (See Penalties and secure, properly tied down (see clause 19 belowTariffs Document) and placed on the ERF. If a corrugated iron structure is used it must be painted dark green.
16.14 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via the HOA to remove plant material where possible or to protect it during construction. The HOA reserves the right to replace plant material at the owner's expense should material be damaged.
16.15 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth which must be adequately secured. BUILDING CONTRACTORS will be held responsible should neighbours be affected by wind blown sand.
16.16 The BUILDING CONTRACTOR will be required to screen of the ERF with a 1,8m high dark green or black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA. A 6m wide access will be allowed on the roadside.
16.17 Owners and contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ > No waste bins on site Site – R1 000.00 penalty. ▪ > Waste bin not complying to regulations – R500.00 penalty. ▪ > Overflowing waste bins – R500.00 penalty. ▪ > Refuse dumped in Estate skip and/or other place within the estate – R1 000.00 penalty. ▪ > Dumping building waste in estate skips – R1 500.00 penalty. ▪ > Dumping excavation soil in an a place other than the allocated area – R2 000.00 penalty ▪ ERF penalty. > Erf not kept in an acceptable tidy state – R500.00 penalty per day.
Appears in 1 contract
BUILDING ACTIVITIES. 16.1 19.1 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the BUILDING CONTRACTOR Building Contractor immediately once the damage becomes evident.
16.2 19.2 All refuse and litter including cement bags and plastic bags must be collected daily and daily, placed in bags which are the to be placed in green (no other colour permitted) waste bins and the refuse shall be removed from the DEVELOPMENT Development regularly or placed in waste bins/containers securely covered when site is vacated(at least once a week) . These bins/ containers are to Waste bins which must have lids which properly seal the bins shall be supplied by the BUILDING CONTRACTOR Building Contractor at the BUILDING CONTRACTOR's Building Contractor’s cost. The bins/ containers Without detracting from the generality of the aforegoing, the Building Contractor specifically acknowledges that all empty cement bags, plastic and other loose material must be emptied and the contents removed from the Estate at appropriate intervalsDevelopment so as not to contaminate the Olive Xxxxxx, but in any event, not less than once a week. The burning of rubbish the dams and fires generally are not permitted under any circumstanceswetlands.
16.3 19.3 The BUILDING CONTRACTOR Building Contractor shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF and must be removed on a weekly basis or as otherwise required by the DEVELOPER/HOA.
16.4 19.4 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the estate managerHOA.
16.5 19.5 The BUILDING CONTRACTOR Building Contractor shall generally ensure that the ERF Erf is at all times kept neat and free of litter or other unsightly waste.
16.6 19.6 If the BUILDING CONTRACTOR Building Contractor fails to keep the ERF Erf in an acceptably tidy state or fails to have the rubble removed, then the DEVELOPER and/or the HOA shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble the costs whereof shall be for the account of the BUILDING CONTRACTORBuilding Contractor.
16.7 19.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT Development, including the Olive Xxxxxx or any surrounding area and the BUILDING CONTRACTOR Building Contractor is required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENTDevelopment.
16.8 19.8 Throughout the construction/erection of the IMPROVEMENTS improvements effective dust control measures must be implemented by the BUILDING CONTRACTOR.Building Contractor
16.9 19.9 All activities relating to the house construction must be confined to within the ERF Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc.
16.10 Unless written permission to encroach onto adjacent site(s)/xxxxx has been obtained from the adjacent site/erf owner(s) and lodged with the HOA:
16.10.1 a simple three stand wire fence must be erected on all the site boundaries other than the road boundary before building activities commence; and
16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites.
16.11 Written permission to encroach onto common areas must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced.
16.10 19.10 The BUILDING CONTRACTOR Building Contractor will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the BUILDING CONTRACTOR Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the BUILDING CONTRACTORBuilding Contractor. The BUILDING CONTRACTOR Building Contractor will be denied access to the DEVELOPMENT until Development such costs have been paid in full.
16.11 19.11 Washing of vehicles and equipment will not be allowed on the DEVELOPMENT Development and must be carried out elsewhere.
16.12 19.12 No fires will be allowed on any part of the DEVELOPMENTDevelopment. Fire extinguishers and a 30 (thirty) meter garden hose with the necessary connections are required to be kept on the ERF Erf site at all times.
16.13 If a store is placed on site it must be acceptable, adequate and secure, properly tied down (see clause 19 below) and placed on the ERF. If a corrugated iron structure is used it must be painted dark green.
16.14 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via the HOA to remove plant material where possible or to protect it during construction. 19.13 The HOA reserves the right to replace plant material at the owner's expense should material be damaged.
16.15 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth which must be adequately secured. BUILDING CONTRACTORS will be held responsible should neighbours be affected by wind blown sand.
16.16 The BUILDING CONTRACTOR Building Contractor will be required to screen of off the ERF Erf with a 1,8m high dark green or black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA in the following circumstances, (i) where there is no screening between the Erf under construction and the adjacent property, (ii) where the Erf is not in an acceptable standard of tidiness determined by the HOA. A 6m wide access will be allowed on the roadside.
16.17 Owners and contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ Breach: ➢ No waste bins on site – R1 000.00 000,00 penalty. ▪ ➢ Waste bin not complying to regulations – R500.00 R500,00 penalty. ▪ ➢ Overflowing waste bins – R500.00 R500,00 penalty. ▪ ➢ Refuse dumped in Estate skip and/or other place within the estate – R1 000.00 000,00 penalty. ▪ ➢ Dumping building waste in estate skips – R1 500.00 500,00 penalty. ▪ ➢ Dumping excavation soil in an place other than the allocated area – R2 000.00 penalty ▪ ERF 000,00 penalty. ➢ Erf not kept in an acceptable tidy state – R500.00 R500,00 per day.
Appears in 1 contract
BUILDING ACTIVITIES. 16.1 18.1 Prior to any construction work taking place on site, all missing Erf pegs have to be reinstated and pointed out to the Building Contractor. During this site meeting, a land surveyor’s certificate (confirming position of the pegs) has to be handed to the inspector, as well.
18.2 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the BUILDING CONTRACTOR Building Contractor immediately once the damage becomes evident.
16.2 18.3 All refuse and litter including cement bags and plastic bags must be collected daily and placed in bags and removed from the DEVELOPMENT Development regularly (at least once a week) or placed in waste bins/containers securely covered when site is vacated. These bins/ containers are to be bins (must have properly fitted lids) supplied by the BUILDING CONTRACTOR Building Contractor at the BUILDING CONTRACTOR's Building Contractor’s cost. The bins/ containers Without detracting from the generality of the a foregoing, the Building Contractor specifically acknowledges that all empty cement bags, plastic and other loose material must be emptied and the contents removed from the Estate at appropriate intervalsDevelopment so as not to contaminate the Estate, but in any event, not less than once a week. The burning of rubbish the dams and fires generally are not permitted under any circumstanceswetlands.
16.3 18.4 The BUILDING CONTRACTOR Building Contractor shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF and must be removed on a weekly basis or as otherwise required by the DEVELOPERHOA/HOABuilding Control Contractor.
16.4 18.5 Excavation of foundation soil may be dumped within the estate, in an area, which specifically was allocated by the estate managerHOA/Building Control Contractor.
16.5 18.6 The BUILDING CONTRACTOR Building Contractor shall generally ensure that the ERF Erf is at all times kept neat and free of litter or other unsightly waste.
16.6 18.7 If the BUILDING CONTRACTOR Building Contractor fails to keep the ERF Erf in an acceptably tidy state or fails to have the rubble removed, then the DEVELOPER and/or the HOA HOA/Building Control Contractor shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble rubble, the costs whereof thereof shall be for the account of the BUILDING CONTRACTOROwner/Building Contractor.
16.7 18.8 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT Development or any surrounding area and the BUILDING CONTRACTOR Building contractor is required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENTDevelopment.
16.8 18.9 Throughout the construction/erection of the IMPROVEMENTS improvements effective dust control measures must be implemented by the BUILDING CONTRACTORBuilding Contractor.
16.9 18.10 All activities relating to the house construction must be confined to within the ERF Erf boundary where construction is taking place. This relates to location of staff, placing of storage bins etc.
16.10 Unless written permission to encroach onto adjacent site(s)/xxxxx has been obtained from the adjacent site/erf owner(s) and lodged with the HOA:
16.10.1 a simple three stand wire fence must be erected on all the site boundaries other than the road boundary before building activities commence; and
16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites.
16.11 Written permission to encroach onto common areas must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced.
16.10 18.11 The BUILDING CONTRACTOR Building Contractor will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the BUILDING CONTRACTOR Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the BUILDING CONTRACTORBuilding Contractor. The BUILDING CONTRACTOR Building Contractor will be denied access to the DEVELOPMENT Development until such costs have been paid in full.
16.11 18.12 Washing of vehicles and equipment will not be allowed on the DEVELOPMENT Development and must be carried out elsewhere.
16.12 No 18.13 NO fires will be allowed on any part of the DEVELOPMENTDevelopment. Fire extinguishers are required to be on the ERF Erf site at all times.
16.13 If a store is placed on site it must be acceptable, adequate and secure, properly tied down (see clause 19 below) and placed on the ERF. If a corrugated iron structure is used it must be painted dark green.
16.14 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via the HOA to remove plant material where possible or to protect it during construction. The HOA reserves the right to replace plant material at the owner's expense should material be damaged.
16.15 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth which must be adequately secured. BUILDING CONTRACTORS will be held responsible should neighbours be affected by wind blown sand.
16.16 The BUILDING CONTRACTOR will be required to screen of the ERF with a 1,8m high dark green or black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA. A 6m wide access will be allowed on the roadside.
16.17 Owners and contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ Breach: • No waste bins on site – R1 000.00 R1000.00 penalty. ▪ • Waste bin not complying too regulations (needs to regulations be emptied weekly) – R500.00 penalty. ▪ • Overflowing waste bins – R500.00 penalty. ▪ • Refuse dumped in Estate skip and/or and /or other place within the estate – R1 000.00 R1000.00 penalty. ▪ • Dumping building waste in estate skips – R1 500.00 R1500.00 penalty. ▪ • Dumping excavation soil in an a place other than the allocated area – R2 000.00 penalty ▪ ERF R2000.00 penalty. • Erf not kept in an acceptable tidy state – R500.00 per day.
Appears in 1 contract
BUILDING ACTIVITIES. 16.1 15.1 Excavation for foundations and/or walls adjoining paved roadways and/or sidewalks must be undertaken with caution and, in particular, the paved roadway/sidewalk must be protected and supported during excavations. Any damage caused to the paved roadway/sidewalk must be made good by the BUILDING CONTRACTOR Building Contractor immediately once the damage becomes evident.
16.2 15.2 All refuse and litter including cement bags and plastic bags must be collected daily and placed in bags and removed from the DEVELOPMENT Development regularly or placed in waste bins/containers securely covered when site is vacated. These bins/ bins/containers are to be supplied by the BUILDING CONTRACTOR Building Contractor at the BUILDING CONTRACTOR's Building Contractor’s cost. The bins/ bins/containers must be emptied and the contents removed from the Estate Development at appropriate intervals, but in any event, not less than once a week. The burning of rubbish and fires generally are is not permitted under any circumstances.
16.3 15.3 The BUILDING CONTRACTOR Building Contractor shall ensure that all building rubble is accumulated in a suitable pre-designated area within the boundaries of the ERF portion and must be removed on a weekly basis or as otherwise required by the DEVELOPERDeveloper/HOATrustees or nominee.
16.4 15.4 Excavation of foundation soil may only be dumped within the estateDevelopment, in an area, which specifically was allocated for this purpose by the estate managerDeveloper/Trustees or nominee.
16.5 15.5 The BUILDING CONTRACTOR Building Contractor shall generally ensure that the ERF portion is at all times kept neat and free of litter or other unsightly waste.
16.6 15.6 If the BUILDING CONTRACTOR Building Contractor fails to keep the ERF portion in an acceptably tidy state or fails to have the rubble removed, then the DEVELOPER Developer and/or the HOA Trustees shall, without prejudice to its other rights, have the right to clean the site and/or remove the rubble the costs whereof shall be for the account of the BUILDING CONTRACTORBuilding Contractor.
16.7 15.7 Under no circumstances will the dumping of any building material or rubble be permitted on any portion of the DEVELOPMENT Development or any surrounding area and the BUILDING CONTRACTOR Building Contractor is required to make his own arrangements for disposing of materials at a spoil site off the DEVELOPMENTDevelopment.
16.8 15.8 Throughout the construction/erection of the IMPROVEMENTS dwelling and/or improvements effective dust control measures must be implemented by the BUILDING CONTRACTORBuilding Contractor.
16.9 15.9 All activities relating to the house construction must be confined to within the ERF portion boundary where construction is taking placeplace and shall not encroach onto adjacent sites. This relates to location of staff, placing of storage bins etc.
16.10 Unless written permission to encroach onto adjacent site(s)/xxxxx has been obtained from the adjacent site/erf owner(s) and lodged with the HOA:
16.10.1 a simple three stand wire 15.10 A suitable fence must be erected on all the site boundaries other than the road boundary before building activities commence; and
16.10.2 building activities, builders' and sub-contractors' employees, delivery personnel and as far as practically possible their vehicles, must not encroach onto adjacent sites.
16.11 Written permission to encroach onto common areas 15.11 The Building Contractor must be obtained from the HOA. In the absence of such permission, the relevant site boundaries must be fenced.
16.10 The BUILDING CONTRACTOR will be expected to keep the appearance of his building site neat and tidy at all times. Litter must be removed from the site on a daily basis. No litter may be stored or mixed in amongst building rubble. Should the BUILDING CONTRACTOR Building Contractor not comply with the removal of building rubble, the rubble will be removed by an outside contractor and the costs thereof claimed from the BUILDING CONTRACTORBuilding Contractor. The BUILDING CONTRACTOR Building Contractor will be denied access to the DEVELOPMENT Development until such costs have been paid in full.
16.11 15.12 Washing of vehicles and equipment will not be allowed on the DEVELOPMENT Development and must be carried out elsewhere.
16.12 15.13 No fires will be allowed on any part of the DEVELOPMENTDevelopment. Fire extinguishers are required to be on the ERF portion/site at all times.
16.13 15.14 If a store is placed on site it must be acceptable, adequate and secure, properly tied down (see clause 19 below) and placed on the ERF. If a corrugated iron structure is used it must be painted dark greenportion according to the specifications of the Developer/Trustees.
16.14 15.15 Where verge landscaping has already been completed, only limited off-street storage and site access will be available. Arrangements must be made via with the HOA Developer/Trustees or nominee to remove plant material where possible or to protect it during construction. The HOA Developer/Trustees reserves the right to replace plant material at the ownerOwner's expense should material be damaged.
16.15 15.16 Sand heaps must be covered before leaving the premises each day. In addition the heaps must be covered during working hors hours if wind is causing it to be blown away. Loose sand must not be left to spread over the building site and must be regularly heaped. All heaps to be covered with a suitable tarpaulin or shade cloth cloth, which must be adequately secured. BUILDING CONTRACTORS Building Contractors will be held responsible should neighbours be affected by wind blown sand.
16.16 The BUILDING CONTRACTOR will be required to screen of the ERF with a 1,8m high dark green or black shade netting screen or any other form of boarding (minimum requirement is a density of 75%)as determined by the DEVELOPER/HOA. A 6m wide access will be allowed on the roadside.
16.17 15.17 Owners and contractors Building Contractors are responsible for ensuring that all legislated safety requirements are complied with. ▪ No waste bins on site – R1 000.00 penalty. ▪ Waste bin not complying to regulations – R500.00 penalty. ▪ Overflowing waste bins – R500.00 penalty. ▪ Refuse dumped in Estate skip and/or other place within the estate – R1 000.00 penalty. ▪ Dumping building waste in estate skips – R1 500.00 penalty. ▪ Dumping excavation soil in an place other than the allocated area – R2 000.00 penalty ▪ ERF not kept in an acceptable tidy state – R500.00 per day.