– CABLE STOWAGE AND HANDLING STUDY Sample Clauses

– CABLE STOWAGE AND HANDLING STUDY. The Contractor shall prepare a Cable Stowage and Handling Study Report (A009-01). The following data shall be provided: - Cable Stowage and Handling Drawing (A009-02) - Cable Gear Stowage and Handling Drawing (A009-03)
AutoNDA by SimpleDocs

Related to – CABLE STOWAGE AND HANDLING STUDY

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • SCOPE OF SERVICES/CASE HANDLING A. Upon execution by Xxxxxx, Attorneys are retained to provide legal services for the purpose of seeking damages and other relief in the Litigation. Client agrees that Xxxxxx may choose to associate additional law firm(s) and/or lawyer(s) to represent Client in connection with the investigation and prosecution of the rights Client has as a purchaser of publically traded securities of Xxxxxx, and Client understands that such representation shall be on the same terms as those described in this agreement.

  • Shipping and Handling Fees The price to the Customer under this Contract shall include all shipping and handling fees. Shipments will be Free On Board Customer’s destination. No additional fees shall be charged to the Customer for standard shipping and handling. If the Customer requests expedited delivery, Customer will be responsible for any charges for expedited delivery.

  • Transporting Students Teachers shall not be required to transport a student in a private vehicle on behalf of the school.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall:  provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring;  perform all terminations; and  supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

  • Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!