DELIVERY, STORAGE, AND HANDLING. The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.
DELIVERY, STORAGE, AND HANDLING. A. Handle pipe, fittings, valves, and accessories carefully to prevent damage. Handle pipe by rolling on skids, forklift, or front end loader. Do not use material damaged in handling. Slings, hooks, or pipe tongs shall be padded and used in such a manner as to prevent damage to the exterior coatings or internal lining of the pipe. Do not use chains in handling pipe, fittings, or appurtenances.
B. To unload pipe, carefully lift and lower it into position using approved padded slings, hooks, or clamps. Furnish equipment and facilities for unloading, handling, distributing, and storing pipe, fittings, valves, and accessories. Make equipment available at all times for use in unloading. Do not roll, drop or dump materials. Any materials dropped or dumped shall be subject to rejection without additional justification.
C. Stored materials including salvaged materials shall be kept in suitable areas safe from damage. The interior of all pipe, fittings, and other appurtenances shall be kept free from dirt or foreign matter at all times. Store and support plastic pipe to prevent sagging and bending. Store plastic pipe and gaskets to prevent exposure to direct sunlight. Valves and hydrants shall be stored and protected from damage by freezing.
D. Pipe shall not be stacked higher than the limits recommended by the manufacturer. The bottom tier shall be kept off the ground on timbers, rails, or concrete. 670.3 Construction Requirements 670.3.01 Personnel
A. General Provisions 101 through 150.
B. Construction and installation of all water utilities shall be performed by a Contractor prequalified/registered with GDOT.
C. All work specified in this section, except for water system service line installation shall be performed by a Contractor with a valid Utility Contractor’s license issued by the State of Georgia. Water service line installation shall be performed by either a Utility Contractor licensed in the State of Georgia or by a Master Plumber licensed in the State of Georgia.
DELIVERY, STORAGE, AND HANDLING. A. Bare-Rooted Plants
B. Balled and Burlapped Plants (B&B)
1. Burlap shall be a natural biodegradable material. Do not use synthetic burlap.
2. Replace plants rejected because of broken or loose balls, or balls of less diameter than that specified.
3. Protect the roots of balled and burlapped plants from moisture loss, unless they are planted immediately after they are delivered.
4. Plants shall be harvested with the ball of earth in which they are growing intact.
DELIVERY, STORAGE, AND HANDLING. Deliver products to site under provisions of Section 01600, Material and Equipment.
DELIVERY, STORAGE, AND HANDLING. A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage and to avoid damaging coatings on steel reinforcement
1. Store reinforcement to avoid contact with earth.
DELIVERY, STORAGE, AND HANDLING. A. Protection: Use all means necessary to protect the materials of this Section before, during, and after installation and to protect the work and materials of all trades.
DELIVERY, STORAGE, AND HANDLING.
1.5.1 The Contractor must dispose of all waste generated as a result of the contract at an officially permitted location. Any fees and/or charges associated with this disposal should be included in bid price of work. JEA will not pay additional charges/fees for waste disposal.
1.5.2 The Contractor shall prevent access by the public to materials, tools, and equipment during the course of the work.
DELIVERY, STORAGE, AND HANDLING. 2.5.1. Deliver materials to the job site in the manufacturer's original, unopened packaged and containers bearing manufacturer's name and label, and the following information:
2.5.1.1. Product name or title of material.
2.5.1.2. Product description (generic classification or binder type) 2.5.1.3. Manufacturer's stock number and date of manufacture.
DELIVERY, STORAGE, AND HANDLING. A. All materials and equipment shall be handled and stored in accordance with the manufacturer’s recommendations.
DELIVERY, STORAGE, AND HANDLING. Deliver the specified products in original, unopened containers with manufacturer’s name, labels, product identification, and batch numbers intact. Store and condition the specified product as recommended by the manufacturer.