Calculation of Air Conditioning Charge Sample Clauses

Calculation of Air Conditioning Charge. The "Air Conditioning Charge" shall be Tenant's share of the total expense associated with the operation and maintenance of the Air Conditioning System (including Amortization of Capital Items) for any given calendar year and the Administrative Fee with respect to all such expenses. Initially, such share shall be equal to the proportion that Xxxxxx's Engineered Value bears to the total of the Engineered Values of all tenants utilizing the Air Conditioning System during each calendar month of the calendar year and averaged for that calendar year. Within thirty (30) days after Tenant opens the Premises for business, Tenant shall submit to Landlord a certified air balance report stating the amount of CFM actually being used by Tenant in the Premises. If Tenant fails to submit such certified air balance report to Landlord within said thirty (30) day period, Landlord may obtain such a certified air balance report at Tenant's expense, which air balance report as completed by Landlord shall be binding and conclusive. If the Air Conditioning System supplies chilled water or other fluid refrigerant to the Premises, Landlord shall measure the GPM actually being used by Tenant in the Premises on the basis of the air balance report. Either party may, at any time, install meters to verify the amount of CFM/GPM used by Tenant. After receipt and verification of the air balance report and/or the metered CFM or GPM readings, Landlord shall use such actual CFM or GPM in the foregoing formula, in lieu of Tenant's Engineered Value.
AutoNDA by SimpleDocs

Related to Calculation of Air Conditioning Charge

  • Heating and Air Conditioning Tenant shall not use any method of heating or air-conditioning, other than that supplied by Landlord, without Landlord’s prior written consent.

  • Air Conditioning 35.01 Landlord shall make available to Tenant, and Tenant shall be permitted to use, the base Building equipment presently supplying air-conditioning service to the Premises and any replacements thereof (the “Existing HVAC Equipment”) Monday to Friday from 8:00 a.m. to 6:00 p.m. (i) during the Building’s “Cooling Season” (which is currently May 15 through October 15) for those portions of the Existing HVAC Equipment serving the perimeter portions of the Premises, and (ii) three hundred sixty-five (365) days a year for those portions of the Existing HVAC System serving the interior portions of the Premises, in each instance subject to and in accordance with the provisions of this Article. Landlord represents that as of the date hereof the Existing HVAC Equipment is in working order and has a cooling capacity which is appropriate for normal office use and normal occupancy density, to wit: the Existing HVAC Equipment is designed to make available a capacity of one (1) ton of HVAC per 300 usable square feet, and is designed to deliver a summer-winter temperature of between 72 and 78 degrees Fahrenheit. Landlord shall repair and maintain the Existing HVAC Equipment in good working order and condition, at Landlord’s cost and expense; provided, however, that all other air conditioning systems, equipment and facilities hereafter located in or servicing the Premises (the “Supplemental Systems”) including, without limitation, the ducts, dampers, registers, grilles and appurtenances utilized to distribute conditioned air within the Premises in connection with both the Existing HVAC Equipment and/or the Supplemental Systems (collectively hereinafter referred to as the “HVAC System”), shall be maintained, repaired and operated by Tenant in compliance with all present and future laws and regulations relating thereto at Tenant’s sole cost and expense. The parties acknowledge that as of the date hereof there is a two (2) ton water cooled supplemental air conditioning unit installed at the Premises (the “Existing Supplemental System”). Landlord hereby approves, in concept only, subject to Tenant’s compliance with the applicable provisions of this Lease including, without limitation, the provisions of this Article and of Article 8, above, Tenant’s installation, at Tenant’s sole cost and expense, of an additional three (3) ton supplemental air conditioning unit (or, should Tenant elect to remove the Existing Supplemental System, then Tenant’s installation of a five (5) ton supplemental air conditioning unit) to service the Premises (the “Additional Supplemental System”). Tenant shall pay for all electricity consumed in the operation of the HVAC System (and/or water, gas and steam) for the production of chilled and/or condenser water and its supply to the Premises, if applicable, which shall become the obligation of Tenant subject to the terms of Article 41 of this Lease. Tenant shall pay for all parts and supplies necessary for the proper operation of the HVAC System (other than the Existing HVAC Equipment) (and any restoration or replacement by Tenant of all or any part thereof shall be in quality and class at least equal to the original work or installations); provided, however, that Tenant shall not alter, modify, remove or replace the HVAC System, or any part thereof, without Landlord’s prior written consent, except that Tenant may remove the Existing Supplemental System in conjunction with Tenant’s installation of a five (5) ton replacement unit as contemplated hereinabove.

  • Heat and Air-Conditioning Landlord shall provide and maintain heat, ventilation and air-conditioning (“HVAC”) equipment sufficient to maintain the Premises at comfortable temperatures for general office use, subject to all federal, state and municipal regulations, during Normal Building Operating Hours (as defined in the Rules and Regulations) and subject to compliance by Tenant with the following and the provisions of Section 6.2.4. If Tenant shall require HVAC at times other than Normal Building Operating Hours, Landlord may furnish such service and Tenant shall pay therefor such charges as may from time to time be in effect. If the temperature otherwise maintained in any portion of the Premises by the HVAC system is affected as a result of (i) the type or quantity of any lights, machines or equipment used by Tenant in the Premises, (ii) the occupancy of any portion of the Premises by more than one person per two hundred (200) square feet of rentable area, (iii) an electrical load for lighting or power in excess of the limits specified in Section 6.2.4, or (iv) any partitioning or other improvements installed by Tenant, then at Tenant’s sole cost, Landlord may install any equipment, or modify any existing equipment Landlord deems necessary to restore the temperature balance. Tenant agrees to keep closed, when necessary, blinds or other window treatments which, because of the sun’s position, must be closed to provide for the efficient operation of the air conditioning system, and Tenant agrees to cooperate with Landlord and to abide by the reasonable regulations and requirements which Landlord may prescribe for the proper functioning and protection of the HVAC system. Landlord shall have no responsibility for providing any service from Separate HVAC Equipment, as defined in Section 6.1.3.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.

  • Aircraft Basic Price The Aircraft Basic Price is listed in Table 1 and is subject to escalation in accordance with the terms of this Purchase Agreement.

  • Change of Location None of the Borrowers shall change the location of its chief executive office or the office where its corporate records are kept or open any new office for the conduct of its business on less than thirty (30) days prior written notice to the Agent.

  • Standard of Care; Uncontrollable Events; Limitation of Liability SMC shall use reasonable professional diligence to ensure the accuracy of all services performed under this Agreement, but shall not be liable to the Company for any action taken or omitted by SMC in the absence of bad faith, willful misfeasance, negligence or reckless disregard by it of its obligations and duties. The duties of SMC shall be confined to those expressly set forth herein, and no implied duties are assumed by or may be asserted against SMC hereunder. SMC shall maintain adequate and reliable computer and other equipment necessary or appropriate to carry out its obligations under this Agreement. Upon the Company's reasonable request, SMC shall provide supplemental information concerning the aspects of its disaster recovery and business continuity plan that are relevant to the services provided hereunder. Notwithstanding the foregoing or any other provision of this Agreement, SMC assumes no responsibility hereunder, and shall not be liable for, any damage, loss of data, delay or any other loss whatsoever caused by events beyond its reasonable control. Events beyond SMC's reasonable control include, without limitation, force majeure events. Force majeure events include natural disasters, actions or decrees of governmental bodies, and communication lines failures that are not the fault of either party. In the event of force majeure, computer or other equipment failures or other events beyond its reasonable control, SMC shall follow applicable procedures in its disaster recovery and business continuity plan and use all commercially reasonable efforts to minimize any service interruption. SMC shall provide the Company, at such times as the Company may reasonably require, copies of reports rendered by independent public accountants on the internal controls and procedures of SMC relating to the services provided by SMC under this Agreement. Notwithstanding anything in this Agreement to the contrary, in no event shall SMC, its affiliates or any of its or their directors, officers, employees, agents or subcontractors be liable for exemplary, punitive, special, incidental, indirect or consequential damages, or lost profits, each of which is hereby excluded by agreement of the parties regardless of whether such damages were foreseeable or whether either party or any entity has been advised of the possibility of such damages.

  • Benchmark Replacement Conforming Changes In connection with the use, administration, adoption or implementation of a Benchmark Replacement, the Administrative Agent will have the right to make Conforming Changes from time to time and, notwithstanding anything to the contrary herein or in any other Loan Document, any amendments implementing such Conforming Changes will become effective without any further action or consent of any other party to this Agreement or any other Loan Document.

  • Maintenance and Repair; Return (a) Lessee, at its sole cost and expense, shall maintain each Property in good condition, repair and working order (ordinary wear and tear excepted) and in the repair and condition as when originally delivered to Lessor and make all necessary repairs thereto and replacements thereof, of every kind and nature whatsoever, whether interior or exterior, ordinary or extraordinary, structural or nonstructural or foreseen or unforeseen, in each case as required by Section 9.1 and on a basis consistent with the operation and maintenance of properties or equipment comparable in type and function to the applicable Property, such that such Property is capable of being immediately utilized by a third party and in compliance with standard industry practice subject, however, to the provisions of Article XV with respect to Casualty and Condemnation.

Time is Money Join Law Insider Premium to draft better contracts faster.