CAPACITIES AND SIZES Clause Samples

CAPACITIES AND SIZES. (a) It is understood that the jurisdiction of the Union includes concrete mixers above one-half (½) yard capacity. When such mixer is used, an Engineer shall be employed. Where two (2) such mixers are operated together as a battery, one (1) Engineer shall be employed. On equipment driven by motors over five (5) horsepower, an Engineer shall be employed. The operation of power tools such as Carpenters’ saws; ▇▇▇▇-hammers used in concrete breaking; portable concrete agitators; and such portable hand tools as are operated by power are not covered by the terms of this Agreement, except as provided under Section 3 of this Agreement. It is further understood and agreed that where the jurisdiction, as set forth in Section 3 hereof, includes a concrete mixer of less than one-half (½) cubic yard capacity; equipment driven by motors of under five (5) horsepower; a boiler of fifteen (15) pounds pressure or under; a compressor used up to one (1) day; it shall not be required that an Engineer be employed.
CAPACITIES AND SIZES. (a) It is understood that jurisdiction includes concrete mixers above one-half (½) yard capacity and all concrete batch plants. Where two (2) such mixers under one-half (½) yard capacity are operated together as a battery, one (1) Engineer shall be employed. An Engineer shall be employed on all equipment driven by gasoline, electric, air, hydraulic, or diesel motor power of five (5) horsepower or over, including but not limited to: core drills, concrete pumps, all size power hoists, and boilers of fifteen (15) pounds pressure or over. An Apprentice or Oiler shall be employed on all temporary power driven heating units such as ▇▇▇▇▇▇ Nelsons, Master, Dravo, Warner, Silent Glo, and similar types, not to exceed five (5) units per man, and on all boilers of less than fifteen (15) pounds pressure. The operation of power tools such as ▇▇▇▇▇▇▇▇▇’▇ saws, ▇▇▇▇-hammers used in concrete breaking, portable concrete agitators and such hand tools as operated by power are not covered by the terms of this Agreement. It is understood that compressors and pumps are included. There shall be no restriction on the use of machinery or tools furnished by the Contractor. (b) A compressor operated into the second (2nd) day or a greater number of days shall require an Engineer. A compressor 125 CFM or under may be operated by an Oiler or Apprentice. When banked compressors are used, one (1) Engineer shall be employed on each bank. (c) Pumps of four (4) inch discharge or over, or three (3) or more pumps of less than four (4) inch discharge shall require an Engineer where pumps as designated above are used steadily into the second (2nd) or greater number of days. An Engineer shall be employed on all wellpoint pumps of over two (2) inch discharge. An Engineer shall be employed on two (2) wellpoint pumps of two (2) inch or less discharge.