Common use of Channel Cross-Section Sketch Clause in Contracts

Channel Cross-Section Sketch. The Engineer shall provide a channel cross-section sketch for span- type bridges. Culverts do not require channel measurements, channel sketches, nor updating of any such forms or sketches that may already be in the folder. If there is an existing channel cross-section sketch plotted to scale in the bridge folder, the Engineer shall bring that sketch forward into the current report, plot the new data on it in a different color ink, and reference the plot with the Team Leader’s initials and date. If the channel cross-section has not changed significantly from the previous inspection, the Engineer’s Team Leader must initial and date a note on the cross-section sketch stating that no significant change has occurred. For all span-bridges that have plans available, the Engineer shall plot the channel cross-section on a to-scale copy of the bridge layout sheet or sheets from the plans. The Engineer shall insert two copies of the layout into the folder if they don’t already exist - one copy must be plotted on as a “work copy” and one copy must remain clean as a “master copy.” If plans are not available, the Engineer shall draw a sketch to scale with cross-section data plotted. It is acceptable for the horizontal and vertical scales to differ.

Appears in 4 contracts

Samples: sb20pca.txdot.gov, sb20pca.txdot.gov, sb20pca.txdot.gov

AutoNDA by SimpleDocs

Channel Cross-Section Sketch. The Engineer shall provide a channel cross-section sketch for span- type bridges. Culverts do not require channel measurements, channel sketches, nor updating of any such forms or sketches that may already be in the folder. If there is an existing channel cross-section DocuSign Envelope ID: 627F8358-8A7B-4817-B186-D6227793E3AE sketch plotted to scale in the bridge folder, the Engineer shall bring that sketch forward into the current report, plot the new data on it in a different color ink, and reference the plot with the Team Leader’s initials and date. If the channel cross-section has not changed significantly from the previous inspection, the Engineer’s Team Leader must initial and date a note on the cross-section sketch stating that no significant change has occurred. For all span-bridges that have plans available, the Engineer shall plot the channel cross-section on a to-scale copy of the bridge layout sheet or sheets from the plans. The Engineer shall insert two copies of the layout into the folder if they don’t already exist - one copy must be plotted on as a “work copy” and one copy must remain clean as a “master copy.” If plans are not available, the Engineer shall draw a sketch to scale with cross-section data plotted. It is acceptable for the horizontal and vertical scales to differ.

Appears in 1 contract

Samples: sb20pca.txdot.gov

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.