Certification and Prohibition. The Engineer hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract.
A. Electronic copy of full scale plans per project (provided on CD or dropbox).
B. Electronic copy of contract Proposal and any Addendums per project (provided on CD or dropbox).
Certification and Prohibition. The Surveyor hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract. Subject to availability, the services to be provided or performed by the State will include, but not be limited to, the following items:
A. Name, address and phone number of the State’s Project Manager.
B. Specifications requirements for all surveys.
Certification and Prohibition. The Engineer hereby certifies that either (i) it meets an exemption criteria under Government Code Section 2270.002; or (ii) it does not boycott Israel and will not boycott Israel during the term of the contract. (A general scope of work must be provided in this attachment. Specific negotiated scopes will be included with each work authorization.)
Certification and Prohibition. The Engineer hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract.
1. Services, Information, and Documentation. The following services, information, documentation, and website links providing electronic access to this documentation, will be provided by the State:
a. Inspection files of each on- and off-system bridge to be inspected.
b. One 8.5” x 11” map showing the location of each bridge to be inspected will be located within each individual bridge folder.
c. The Texas Bridge Load Rating (TBLR) Program Manual and software, which is available at: xxxx://xxx.xxxxx.xxx/inside-txdot/division/information-technology/engineering- software.html
d. The “RATE” spreadsheet, which is available at: xxxx://xxx.xxxxx.xxx/inside-txdot/forms-publications/consultants- contractors/publications/bridge.html
e. A login username and password for each Team Leader to use with the current bridge management software.
f. Standard inspection forms in electronic format. Documentation not generated as output by the bridge management software is accessible through the TxDOT’s official form repository website at xxxx://xxx.xxxxx.xxx/inside-txdot/forms-publications/consultants- contractors/forms/bridge.html. Forms to be used include the following: Bridge Inspection Record (Form 1085) Bridge Inspection Follow-up Action Worksheet (On-system) (Form 1386) Bridge Inspection Follow-up Action Worksheet (Off-system) Bridge Inventory Record (Form 536) Revision to Bridge Inventory Record (Form 2242) Channel Cross-Section Measurements Record (Form 2600) Underclearance Record (Form 2601) Bridge Structural Condition History (Form 2238) Bridge Load Rating Statement (Form 2495) Bridge Summary Sheet (Form 2602) Summary of Needed Load Posting Materials (Form 2244) Recommended Change in Bridge Load Posting (Form 1083R) TxDOT Bridge Division Critical Inspection Finding (CIF) (Form 2598) Scour Summary Sheet for Known Foundations (Form 2605*) Scour Summary Sheet for Bridge Class Culverts (Form 2606*) TxDOT Bridge Scour Plan of Action for Bridges with Item 113 Coded “3” (Form 2604*) *for reference purposes only
g. An electronic listing of National Bridge Inventory (NBI) data for all the bridge records to be inspected. DocuSign Envelope ID: 517DD8EC-82B3-4B01-B9ED-9BE0F8A2F1DA
h. List of inspection database input fields currently blocked by the State, which is available at: xxxx://xxx.xxxxx.xxx/inside-txdot/forms-publications/consultants- contractors/publicat...
Certification and Prohibition. The Engineer hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract. Subject to availability, the services to be provided or performed by the State will include, but not be limited to, the following items:
A. Name, address and phone number of the State’s Project Manager.
B. Existing phasing and timing sheets, the clearance intervals to be used and the pedestrian walk and don't walk times for all of the intersections in the specific project.
Certification and Prohibition. The Engineer hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract. (The negotiated scope for this contract must be provided in this attachment. The work authorization scopes will be derived from this attachment.) THIS WORK AUTHORIZATION is made pursuant to the terms and conditions of Article 5 of Engineering Contract No. (the Contract) entered into by and between the State of Texas, acting by and through the Texas Department of Transportation (the State), and (the Engineer).
PART I. The Engineer will perform engineering services generally described as in accordance with the project description attached hereto and made a part of this Work Authorization. The responsibilities of the State and the Engineer as well as the work schedule are further detailed in exhibits A, B and C which are attached hereto and made a part of the Work Authorization.
PART II. The maximum amount payable under this Work Authorization is $ and the method of payment is as set forth in Attachment E of the Contract. This amount is based upon fees set forth in Attachment E, Fee Schedule, of the Contract and the Engineer’s estimated Work Authorization costs included in Exhibit D, Fee Schedule, which is attached and made a part of this Work Authorization.
PART III. Payment to the Engineer for the services established under this Work Authorization shall be made in accordance with Articles 3 thru 5 of the contract, and Attachment A, Article 1.
PART IV. This Work Authorization shall become effective on the date of final acceptance of the parties hereto and shall terminate on , unless extended by a supplemental Work Authorization as provided in Attachment A, Article 1.
PART V. This Work Authorization does not waive the parties' responsibilities and obligations provided under the Contract.
Certification and Prohibition. The Engineer hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract. (A general scope of work must be provided in this attachment. Specific negotiated scopes will be included with each work authorization.)
PART I. The Engineer will perform engineering services generally described as in accordance with the project description attached hereto and made a part of this Work Authorization. The responsibilities of the State and the Engineer as well as the work schedule are further detailed in exhibits A, B and C which are attached hereto and made a part of the Work Authorization.
PART II. The maximum amount payable under this Work Authorization is $ and the method of payment is as set forth in Attachment E of the Contract. This amount is based upon fees set forth in Attachment E, Fee Schedule, of the Contract and the Engineer’s estimated Work Authorization costs included in Exhibit D, Fee Schedule, which is attached and made a part of this Work Authorization.
Certification and Prohibition. The Technical Expert hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract.
1. Services to be Provided
Certification and Prohibition. The Technical Expert hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract.
1. Provide name, address and phone number of the State’s authorized representative.
2. Provide any records available which would assist in the completion of non-archeological historic-age resource studies.
3. Provide engineering data through a third party contract which would assist in the completion of non- archeological historic-age resource studies.
4. Assist in the coordination of site visits, scheduling and XXX, if problems arise.
5. Review recommendations offered by the Technical Expert and approve or reject any or all work performed under this contract.
6. Review progress of work and provide final acceptance of all documents.
7. Process periodic payment requests submitted by Technical Expert.
8. Submit documentation to regulatory agencies for review and comment unless otherwise specified in a work authorization.
9. Submit research designs, letter reports and survey reports to THC, and performing all consultation with THC.
10. Remedy all deficiencies identified by THC if those deficiencies arise from restrictions placed on the Technical Expert’s level of effort by the State.
11. Provide the Technical Expert with all comments regarding their review of the environmental services completed.
12. Provide (when specified in the work authorization) XXX from public or private land owners to allow non- archeological historic-age resource studies to be performed. XXX permission must be written and signed by the land owner. Letters or other materials seeking XXX must contain explicit reference to the kinds of activities for which XXX is requested and an indication of the impacts (if any) that will result from performance of non-archeological historic-age resource studies.
13. Provide the Technical Expert with descriptions of current and proposed facilities as such information is available to the State and within reasonable limits.
14. Notify the Technical Expert if THC review or State inspection discloses deficiencies for which the Technical Expert is responsible in accordance with the contract.
15. Provide the Technical Expert, where necessary, with barriers, cones, and other traffic control equipment or personnel needed to assure safe working conditions in the project area.
16. Provide the Technical Expert with maps delineating project area limits, existing and proposed right of way limits, existing alignments, utilities, and other in...
Certification and Prohibition. The Engineer hereby certifies it does not boycott Israel and shall not boycott Israel during the term of the contract. The STATE will provide the following:
a. Name, address and phone number of the State’s project manager.
b. Any records available to be used for the completion of the environmental services.
c. Review comments and recommendations offered by the Engineer and approve or reject any or all work performed under this contract.
d. Review of progress of work and final acceptance of all documents.
e. Processing of all periodic payment requests submitted by Engineer.
f. Submittal of documentation to regulatory agencies for review and comment when specified.
g. All comments regarding the review of the environmental services completed.
h. Assistance in the coordination and scheduling of site visits.
i. Review and approve typical roadway and bridge cross sections created by the Engineer.
j. Provide available planimetric mapping, aerial photography and Digital Terrain Model (DTM) for the corridor.
k. Provide available horizontal control points, benchmark elevations and descriptions for vertical control in the project area.
l. Make available existing Right-of-Way (ROW) maps of state highway facilities in the project corridor.
m. Make available interface data for any projects adjacent to the project corridor.
n. Provide current average bid prices for construction, maintenance, and operation costs.
o. Assist as necessary in obtaining the required data and information from other local, regional, state, and federal agencies.
p. Provide the Engineer with timely reviews and decisions necessary for the Engineer to maintain the project work schedule.
q. Provide the Engineer with examples of acceptable format for the deliverables required by the work authorizations.
r. Provide the Engineer with the current version of all State’s Guidelines for preparation of, air quality analysis. Make available versions of “recommended text” for air, noise, or other studies that the State desires standard wording to be used. DocuSign Envelope ID: 7C32DB83-85AE-48EE-A908-464642C11C85
a. AASHTO – American Association of State Highway and Transportation Officials
b. BEG - Bureau of Economic Geology, University of Texas at Austin
c. CEQ - Council on Environmental Quality
d. ENV - Environmental Affairs Division of the Texas Department of Transportation
e. District - One of the 25 geographical districts into which the Texas Department of Transportation is divided.
f. FEMA - Federal Eme...