Characteristics of the level (a) A person employed as a Social and community services employee level 6 will operate under limited direction from senior employees or management and undertake a range of functions for which operational policies, practices and guidelines may need to be developed.
Characteristics The Initial Contracts have the following characteristics: (i) all the Contracts are secured by Motorcycles; (ii) no Initial Contract has a remaining maturity of more than 84 months; and (iii) the final scheduled payment on the Initial Contract with the latest maturity is due not later than June 2014. Approximately 77.89% of the Principal Balance of the Initial Contracts as of the Initial Cutoff Date is attributable to loans for purchases of new Motorcycles and approximately 22.11% is attributable to loans for purchases of used Motorcycles. No Initial Contract was originated after the Initial Cutoff Date. No Initial Contract has a Contract Rate less than 3.989%. The last scheduled payment date of the Contracts (including any Subsequent Contracts) is due not later than September 2014. Approximately 98.98% of the Principal Balance of the Initial Contracts as of the Initial Cutoff Date is attributable to loans to purchase Motorcycles manufactured by Harley-Davidson or Buell and approximately 1.02% of the Principal Balance of the Initial Contracts as of the Initial Cutoff Date is attributable to loans to purchase Motorcycles not manufactured by Harley-Davidson or Buell.
Additional Service Characteristics 3.12 The technical specification of the Bitstream 2a Service is set out in Appendix B.
CHARACTERISTICS OF THE ACADEMY 10) The characteristics of the Academy set down in Section 1(6) of the Academies Act 2010, are that:
Criteria (1) Annual Evaluation Criteria. All performance evaluations shall be based upon assigned duties, and shall carefully consider the nature of the assignment in terms, where applicable, of:
CLASS SIZE/STAFFING LEVELS The board will make every effort to limit FDK/Grade 1 split grades where feasible. APPENDIX A – RETIREMENT GRATUITIES
Technical Characteristics The Participating Generator has provided to the CAISO in Schedule 1 the required information regarding the capacity and operating characteristics of each of the Generating Units listed in that schedule. Pursuant to Sections 8.9 and 8.10 of the CAISO Tariff, the CAISO may verify, inspect and test the capacity and operating characteristics provided in Schedule 1.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Target Population The Grantee shall ensure that diversion programs and services provided under this grant are designed to serve juvenile offenders who are at risk of commitment to Department.