CODE DESCRIPTION Sample Clauses

CODE DESCRIPTION. 1 This firm is unavailable to participate in the contract for the reason(s) stated on the DBE Solicitation Response. (Attach explanation to the Log.) 2 This firm is no longer in business. (NOTE: If this action is checked, attach your explanation as to why the solicitation was sent to the firm and how evidence that it was no longer in business was obtained. Attach the returned envelope showing that it was undeliverable, for instance.
CODE DESCRIPTION. Alya is a multi-scale, multi-physics simulation code developed by the team co-lead by ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ and ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ at the Barcelona Supercomputing Centre (BSC). The simulations involve the solution of Partial Differential Equations in an unstructured mesh using Finite Elements methods. In the context of CompBioMed the code has been used for coupled cardiac fluid-electro-mechanical simulations, from ion-channel kinetics up to organ level; and simulations of the respiratory system, particularly focusing on particle deposition. Alya is available for use to researchers at several HPC systems; for clinical and industrial users, BSC recommends users access it as a service, due to the complexity involved with setting up simulations. To this purpose BSC has launched a spin-off (ELEM Biotech [9]) that will provide commercial software-as-a-service to medical device, pharmaceutical and biomedical industries using Alya.
CODE DESCRIPTION. Binding Affinity Calculator (BAC), developed in part by UCL and partly by EnsembleMD [34], is a workflow for the automated building, execution and analysis of a diverse range of Molecular Dynamics (MD) based free energy calculations. Designed to coordinate large numbers of simulations, it currently runs on multi-petaflops and emerging exascale environments. The workflow tool runs and analyses simulations designed to assess how well drugs bind to their target proteins and the impact of changes to those proteins. The code uses ensemble simulations to robust, accurate and precise free energy computations from both alchemical and end-point analysis methodologies. BAC is a fairly complex tool to use, so at the moment the development team at UCL have made it available as part of consulting services or for research collaborations. EnsembleMD provides user-friendly interfaces to related binding affinity calculation services also available through the on-line store of associate partner DNAnexus (limited access).
CODE DESCRIPTION. Psychotic disorder with hallucinations due to known physiological condition

Related to CODE DESCRIPTION

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout 9314A Single Lane / Level 1 NFSR 9314 0.00 END 0.20

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.

  • Overtime Description For Paid Holidays: Holiday pay for all holidays shall be prorated based two hours per day for each day worked in the holiday week, not to exceed 8 hours of holiday pay. For Thanksgiving week, the prorated share shall be 5 1/3 hours of holiday pay for each day worked in Thanksgiving week. Overtime Time and one half the regular rate after an 8 hour day. Time and one half the regular rate for Saturday. Double time the regular rate for Sunday.

  • Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}