Commercial priorities Sample Clauses

Commercial priorities. In consultation with the Commercial Commissioner, for each race during each Event, the Regatta Director shall set two (2) or three (3) lap courses and shall alter the position of the start and/or finish line (and may alter the length of any leg) of the race course, in each case:
AutoNDA by SimpleDocs

Related to Commercial priorities

  • Telephone Service Prioritization; 4.1.4.11.2 Related services for handicapped;

  • Data Protection Impact Assessment and Prior Consultation Processor shall provide reasonable assistance to the Company with any data protection impact assessments, and prior consultations with Supervising Authorities or other competent data privacy authorities, which Company reasonably considers to be required by article 35 or 36 of the GDPR or equivalent provisions of any other Data Protection Law, in each case solely in relation to Processing of Company Personal Data by, and taking into account the nature of the Processing and information available to, the Contracted Processors.

  • Fire, Life Safety, and Accessibility Codes The following codes, in the versions approved by the Georgia State Fire Marshal/Fire Safety Commissioner and Department of Human Resources, shall be used. The Design Professional will designate any additional codes or special modifications in the Supplementary General Conditions.

  • Constructability Program 5.2.1 Implement and conduct a constructability program to identify and document Project cost and schedule savings opportunities. The constructability program shall follow accepted industry practices and be reviewed by Owner at design milestones. Whenever the term “value engineering” is used in conjunction with this Agreement or the Project, it has its commonly accepted meaning within the construction industry and does not imply the practice of professional engineering without a license. If any value engineering activities constitute the professional practice of engineering, then such activities shall be performed by an engineer licensed in Texas.

  • Prioritization All reported incidents receive a priority number based on the impact and urgency of the service interruption. Impact is determined based on the number of people/departments/buildings that are affected by the interruption or outage. Life-Safety issues are taken into consideration for assessing and assigning priorities. Urgency is based on the acceptable delay to restore the service. Urgency can be critical or high and is determined based on the nature of the service outage. UNM IT may prioritize incoming incident requests as P1 or P2 priority if it meets one or more of the following criteria:  Significant number of people affected;  The level to which work is impaired for individuals;  Academic and Administrative Calendar deadlines;  Significant impact on the delivery of instruction;  Significant risk to safety, law, rule, or policy compliance.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • ADMISSION REQUIREMENTS FOR SENIOR COLLEGE PROGRAM  The A.A. degree and a minimum GPA of 2.00  Grade of C or better in a credit-bearing mathematics course worth three or more credits*  Grade of C or better in freshman composition, its equivalent, or a higher-level English course* *(Effective 10/1/08, per University policy) Students who wish to transfer but do not meet all of the above requirements or are unable to enroll within two years after graduation will receive admission consideration under our standard transfer credit policies. Total transfer credits granted toward the baccalaureate degree: 60 Total additional credits required at the senior college to complete baccalaureate degree: 60 Total credits required for the B.A. in Global History: 120

  • Cooperative Procurement To the maximum extent permitted by applicable law, we agree that this Agreement may be used as a cooperative procurement vehicle by eligible jurisdictions. We reserve the right to negotiate and customize the terms and conditions set forth herein, including but not limited to pricing, to the scope and circumstances of that cooperative procurement.

  • Review by the World Bank of Procurement Decisions The Procurement Plan shall set forth those contracts which shall be subject to the World Bank’s Prior Review. All other contracts shall be subject to Post Review by the World Bank.

Time is Money Join Law Insider Premium to draft better contracts faster.