Transit-oriented facility means a facility that houses a transit station in a manner that promotes transit ridership or passenger rail use.
building line means a rear space, side space or street front space;
Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.
Trunk Line means the coaxial/optic fiber cable network and other allied equipment such as receiver nodes, amplifiers, splitters etc. owned and installed by the multi-system operator or its associate companies for the purpose of transmitting Cable TV Signal to various LCOs till the receiving end of various LCOs, including the LCO, to enable them to re-transmit the Cable TV Signal to respective subscribers; All other words and expressions used in this interconnection agreement but not defined, and defined in the Act and rules and regulations made thereunder or the CTN Act and the rules and regulations made thereunder, shall have the meanings respectively assigned to them in those Acts or the rules or regulations, as the case may be.
Rear lot line means the lot line that is opposite the front lot line in the case of a lot having four sides, and where the rear portion of a lot is bounded by intersecting side lot lines the point of intersection is deemed the rear lot line;
Micro wireless facility means a small cell facility that is not larger in dimension than 24 inches in length, 15 inches in width, and 12 inches in height and that has an exterior antenna, if any, not longer than 11 inches.
Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.
Fiber means a glass strand or strands which is/are protected by a color coded buffer tube and which is/are used to transmit a communication signal along the glass strand in the form of pulses of light.
Wireless facility means equipment at a fixed location that enables wireless communications
Cannabis cultivation facility means a person that:
electric line means any line which is used for carrying electricity for any purpose and includes:
Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.
As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record
Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.
Fuel cell means an energy converter transforming chemical energy (input) into electrical energy (output) or vice versa.
Fabrication means making up data or results and recording or reporting them.
Construction, panel, and floor covering adhesive means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:
Diameter means the diameter of the stem of a tree measured outside the bark at a specified point of measurement.
Metal means precious metal, including, without limitation, gold, silver, platinum, palladium, rhodium, iridium, and ruthenium.
Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.
Torso line means the centreline of the probe of the 3-D H machine with the probe in the fully rearward position;
Lot Line means any boundary of a lot.
Cannabis processing facility means a person that: