Compaction Methods Sample Clauses

Compaction Methods. Compaction Method A: Breaking track while operating equipment on the traveled way. Compaction Method B: 7-10 ton pneumatic, steel, or equivalent vibratory roller, operated to cover the full width two (2) times. Either Method A or B may be used unless Method B is designated in C(T)5.31#. T-815 – Paved Surface Cleaning (06/2020) 815.01 DESCRIPTION This work consists of removing loose material from paved traveled way, including bridge decks, paved shoulders, and paved turnouts.
AutoNDA by SimpleDocs
Compaction Methods. Compaction method commonly acceptable is mechanical tamping with pneumatic or vibrating equipment. The Applicant shall not use any compaction method that may cause damage to Utility and/or other joint trench occupant's facilities. Compaction by water jetting will not beallowed.

Related to Compaction Methods

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an eradication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all case5 when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shall be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb-xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with mortar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. When the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick- work.

Time is Money Join Law Insider Premium to draft better contracts faster.