Compile and Test Senselock EL Codes Sample Clauses

Compile and Test Senselock EL Codes. Before modifying the code (pc_demo1.c) at the PC end, you can compile and test the Senselock EL code you have just compiled. In the just-created project, choose the menu “Project”🡪 ―Components, Environment and Books” and click “Add Files” in the dialog box to add demo1.c to the project. In the meantime, you can add ―Ses51L.lib‖ offered by Senselock EL SDK to the project5. Choose the menu ―Project‖🡪―Build target‖ to compile codes. If the compilation is successful, a file (demo1.hex) will be generated under the directory of C:\s4demo. This file is the result of code compilation. Now you can test or debug Senselock EL codes. For the details about testing and debugging technique, please refer to Chapter 4 ―Developing Senselock ELCode‖ and Chapter 5 ―Direction for Compiler Usage‖.
AutoNDA by SimpleDocs

Related to Compile and Test Senselock EL Codes

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

  • Information Technology Accessibility Standards Any information technology related products or services purchased, used or maintained through this Grant must be compatible with the principles and goals contained in the Electronic and Information Technology Accessibility Standards adopted by the Architectural and Transportation Barriers Compliance Board under Section 508 of the federal Rehabilitation Act of 1973 (29 U.S.C. §794d), as amended. The federal Electronic and Information Technology Accessibility Standards can be found at: xxxx://xxx.xxxxxx-xxxxx.xxx/508.htm.

  • Scope and Application This Appendix will apply to all work undertaken within the Employer’s Workshop(s) by employees mainly engaged at the Workshop.

  • Tests, Labs, and Imaging and X rays (diagnostic) This plan covers diagnostic tests, labs, and imaging and x-rays to diagnose or treat a condition when ordered by a physician. Major Diagnostic Imaging and Tests Major diagnostic imaging and tests include but are not limited to: • magnetic resonance imaging (MRI), • magnetic resonance angiography (MRA), • computerized axial tomography (CAT or CT scans), • nuclear scans, • positron emission tomography (PET scan), and • cardiac imaging. Preauthorization may be required for major diagnostic imaging and tests. This plan covers MRI examinations when the quality assurance standards of R.I. General Law §27-20-41 are met. MRI examinations conducted outside of the State of Rhode Island must be performed in accordance with the applicable laws of the state in which the examination has been conducted. Diagnostic Imaging and X-rays (other than the imaging services noted above) Diagnostic imaging and x-rays include but are not limited to: • general imaging (such as x-rays and ultrasounds), and • mammograms.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Outpatient emergency and urgicenter services within the service area The emergency room copay applies to all outpatient emergency visits that do not result in hospital admission within twenty-four (24) hours. The urgicenter copay is the same as the primary care clinic office visit copay.

  • Drug and Alcohol Testing – Safety-Sensitive Functions A. Employees required to have a Commercial Driver’s License (CDL) are subject to pre-employment, post-accident, random and reasonable suspicion testing in accordance with the U.S. Department of Transportation rules, Coast Guard Regulations (46 CFR Part 16) or the Federal Omnibus Transportation Employee Testing Act of 1991. The testing will be conducted in accordance with current Employer policy.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Training Sub-Type Code There are Sub-Type Categories for each of the three (3) different Training Type Codes. Select one (1) Sub-Type Category code that applies to the training type code you selected. (Select from the chart on pages 10-12.)

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

Time is Money Join Law Insider Premium to draft better contracts faster.