CONCENTRATED SULFURIC ACID TEST (SULFONATION Sample Clauses

CONCENTRATED SULFURIC ACID TEST (SULFONATION. In a dry test tube, pour 1 mL concentrated sulfuric acid carefully. Add 0.5 mL of heptane into the tube and shake. Record your observation. Repeat this test for the other two hydrocarbons.

Related to CONCENTRATED SULFURIC ACID TEST (SULFONATION

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing buildings or that occupy an area under 50 square feet behind the building they serve.

  • Emergency Generator 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator. 2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease. 3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in accordance with the Lease and this Amendment. Tenant shall repair any damage caused by such removal, including the patching of any holes to match, as closely as possible, the color surrounding the area where the Generator and appurtenances were attached. Such maintenance and operation shall be performed in a manner to avoid any unreasonable interference with any other tenants or Landlord. Tenant agrees to maintain the Generator, including without limitation, any enclosure installed around the Generator, in good condition and repair. Tenant shall be responsible for performing any maintenance and improvements to any enclosure surrounding the Generator so as to keep such enclosure in good condition. 4) Tenant, subject to the reasonable rules and regulations enacted by Landlord, shall have unlimited access to the Generator and its surrounding area for the purpose of installing, operating, repairing, maintaining, using and removing the Generator. 5) Tenant shall only test the Generator before or after normal business hours. 6) Notwithstanding anything in this Amendment or the Lease to the contrary, Tenant may use the Generator for its intended purpose as and when needed (as reasonably determined by Tenant), without any restriction or hindrance from Landlord or any other tenant, subject only to applicable Laws and unreasonable disturbances to other tenants in the Project.