Common use of Conceptual Engineering Clause in Contracts

Conceptual Engineering. The scope of work involves developing a conceptual engineering package that considers replacing circuit breakers T9-12, T10-12, 90312, 92512 (70512 National Grid name), 7B-12, and T11-12, replacing the existing breaker disconnect switches with new motor operated disconnect switches (MODs), removing breaker T11-12 from NYSEG’s Old Gardenville Station and installation of a new T11-12 breaker and associated switches on the open bay where the existing line T11 is currently connected, and installation of four (4) new single phase CCVT’s. Specifically, the following will be addressed:  Retirement of the NYSEG Old Gardenville Substation.  Relocation of Circuit Breaker position T11-12 from the NYSEG Old Gardenville Substation to the NYSEG New Gardenville Substation.  Installation of ten (10) motor operated disconnect switches; T10-14 (NG962), T11-15, 90314, 90315, T9-16, T9-14, 92514, 92515, T10-16, and T6-16 and associated P&C equipment.  Installation of Protection & Control (“P&C”) equipment to accommodate 115kV connections from NYSEG Circuit Breaker T10-12 and relocated NYSEG Circuit Breaker T11-12 to the rebuilt National Grid Gardenville 115kV Substation.  At NYSEG’s Erie Street Substation, installation of new relay and tone equipment and removal of the RFL 6745 to accommodate the 115kV connection from NYSEG’s Erie Street Substation to the rebuilt National Grid Gardenville 115kV Substation.  Installation of A & B fiber cables between the rebuilt National Grid Gardenville 115kV Substation and NYSEG New Gardenville Substation.  Installation of new A & B battery systems and new automation platform.

Appears in 4 contracts

Samples: Cost Reimbursement Agreement, Cost Reimbursement Agreement, Cost Reimbursement Agreement

AutoNDA by SimpleDocs

Conceptual Engineering. The scope of work involves developing a conceptual engineering package that considers replacing circuit breakers T9-12, T10-12, 90312, 92512 (70512 National Grid name), 7B-12, and T11-12, replacing the existing breaker disconnect switches with new motor operated disconnect switches (MODs), removing breaker T11-12 from NYSEG’s Old Gardenville Station and installation of a new T11-12 breaker and associated switches on the open bay where the existing line T11 is currently connected, and installation of four (4) new single phase CCVT’s. Specifically, the following will be addressed: Retirement of the NYSEG Old Gardenville Substation. Relocation of Circuit Breaker position T11-12 from the NYSEG Old Gardenville Substation to the NYSEG New Gardenville Substation. Installation of ten (10) motor operated disconnect switches; T10-14 (NG962), T11-15, 90314, 90315, T9-16, T9-14, 92514, 92515, T10-16, and T6-16 and associated P&C equipment. Installation of Protection & Control (“P&C”) equipment to accommodate 115kV connections from NYSEG Circuit Breaker T10-12 and relocated NYSEG Circuit Breaker T11-12 to the rebuilt National Grid Gardenville 115kV Substation. At NYSEG’s Erie Street Substation, installation of new relay and tone equipment and removal of the RFL 6745 to accommodate the 115kV connection from NYSEG’s Erie Street Substation to the rebuilt National Grid Gardenville 115kV Substation. Installation of A & B fiber cables between the rebuilt National Grid Gardenville 115kV Substation and NYSEG New Gardenville Substation. Installation of new A & B battery systems and new automation platform.

Appears in 1 contract

Samples: Cost Reimbursement Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.