Conduit Installation In Paved And Dirt Shoulders Sample Clauses

Conduit Installation In Paved And Dirt Shoulders. The installation of conduit and conduit systems along the shoulders of a traveled way shall be planned and installed in a manner to minimize the length of time that traffic is exposed to a difference in elevation condition. The following restrictions and limitations shall apply:
AutoNDA by SimpleDocs

Related to Conduit Installation In Paved And Dirt Shoulders

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Delivered and Installed Off loaded, and installed. Installation shall include but not limited to; any and all labor, material, and tools necessary to install furniture in accordance with approved plans and specifications and/or the direction of authorized agency personnel. The installation company will be responsible for the removal of any trash, packing material, and cartons associated with their installation. The contractor/installation company will repair/replace (to the satisfaction of the ordering entity) any damage to the building or its’ contents that they (the contractor) caused in the course of their work. This includes but is not limited to: walls, floors, floor coverings, ceilings, elevators, doors, doorways, and any existing fixtures and furniture. The agency may withhold payment until repairs are satisfactorily completed.

  • Life support equipment (a) If a person living at your premises requires life support equipment, you must register the premises with your retailer or with us. To register, you will need to give written confirmation from a registered medical practitioner of the requirement for life support equipment at the premises.

  • Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.

  • -wire Unbundled Digital/DS0 Loop These are designed 4-wire Loops that may be configured as 64kbps, 56kbps, 19kbps, and other sub-rate speeds associated with digital data services and will come standard with a test point, OC, and a DLR.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Local Switching Interfaces 4.2.13.1 Newcomm shall order ports and associated interfaces compatible with the services it wishes to provide as listed in Exhibit A. BellSouth shall provide the following local switching interfaces:

  • Earned Value Management System ‌ An earned value management system (EVMS) means a project management tool that effectively integrates the project scope of work with cost, schedule and performance elements for optimum project planning and control. The qualities and operating characteristics of EVMS are described in American National Standards Institute /Electronics Industries Alliance (ANSI/EIA) Standard-748. An EVMS is not mandatory; however, Contractors are encouraged to have an EVMS ANSI/EIA Standard-748 during the entire term of OASIS. The Contractor shall notify the OASIS CO, in writing, if there are any changes in the status of their EVMS and provide the reasons for the change and copies of audits by the Defense Contract Management Agency (DCMA) or other cognizant Government administration office, as applicable. If only part of a Contractor’s organization is EVMS ANSI/EIA Standard-748 certified, the Contractor shall make the distinction between which business units or sites and geographic locations have been certified.

  • SPECIAL TOOLS & TEST EQUIPMENT If the price stated on the Offer includes the cost of any special tooling or special test equipment fabricated or required by the Contractor for the purpose of filling this order, such special tooling equipment and any process sheets related thereto shall become the property of the City and shall be identified by the Contractor as such.

Time is Money Join Law Insider Premium to draft better contracts faster.