Construction Methods. Discharge flowable fill material directly from the truck into the space to be filled, or by other approved methods. The mix may be placed full depth or in lifts as site conditions dictate. The Contractor shall provide a method to plug the ends of the existing pipe in order to contain the flowable fill.
Appears in 3 contracts
Samples: Roadway Contract, Roadway Contract, Roadway & Structure Contract
Construction Methods. Discharge flowable fill material directly from the truck into the space to be filled, or by other approved methods. The mix may be placed full depth or in lifts as site conditions dictate. The Contractor shall provide a method to plug the ends of any holes in the existing pipe and masonry drainage structures in order to contain the flowable fill.
Appears in 3 contracts
Samples: Roadway Contract, Roadway & Structure Contract, Roadway & Structure Contract