Conversion Programming Sample Clauses

Conversion Programming. To facilitate the conversion of the Directory Content to the Internet Format, YPS will develop one or more software conversion programs (“Conversion Utilities”) and/or modify the software programs utilized by the Directory Infrastructure Systems to permit the conversion of data from the format used by Publisher’s publishing systems to the Internet Format. This conversion of the Directory Content, including the Conversion Utilities, shall conform to the standards, and be completed within the time deadlines, specified in the Directory Conversion Schedule. Upon timely and satisfactory completion of the Conversion Utilities, YPS shall be entitled to xxxx Publisher for the one-time Initial Conversion Set-up Fee specified in the Project Compensation Schedule attached to this Agreement as Exhibit G.
AutoNDA by SimpleDocs

Related to Conversion Programming

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Interfaces GTE provides the CLECs with choices for access to OSS pre-ordering, ordering, maintenance and repair systems. Availability of the interfaces is fundamental to the CLEC being able to effectively do business with GTE. Additionally, in many instances, CLEC personnel must work with the service personnel of GTE. Measurements in this category assess the availability to the CLECs of systems and personnel at GTE work centers.

  • Programming Processor is not responsible for programming or reprogramming of fuel dispensers.

  • Unbundled Network Element Combinations 5.1. Unbundled Network Element Combinations shall include: 1) Enhanced Extended Links (EELs); 2) UNE Loops/Special Access Combinations; 3) Loop/Port Combinations; and 4)

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central Xxxxxx Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4. 5.7.2 BellSouth shall make available the following channelization systems and interfaces: 5.7.2.1 DS1 Channelization System: channelizes a DS1 signal into a maximum of twenty- four (24)

  • Installation and Conversion State Street and the Fund shall be responsible for the technical installation and conversion (“Installation and Conversion”) of the Designated Configuration. The Fund shall have the following responsibilities in connection with Installation and Conversion of the System: (i) The Fund shall be solely responsible for the timely acquisition and maintenance of the hardware and software that attach to the Designated Configuration in order to use the Data Access Services at the Designated Locations, and (ii) State Street and the Fund each agree that they will assign qualified personnel to actively participate during the Installation and Conversion phase of the System implementation to enable both parties to perform their respective obligations under this Addendum.

  • CLEC to CLEC Conversions for Unbundled Loops 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear must order and will be billed for both OC and OC-TS if requesting OC-TS.

  • Functionality Customer is entitled to additional functionality previously purchased or bundled with the software if available in the version or update released on or after the start date of the Agreement. Customer acknowledges that certain functionality in current and previous software versions may not be available in future upgrades. Added functionality may require additional paid services (clinical and technical) to configure and support.

  • Provisional Interconnection Service Upon the request of Interconnection Customer, and prior to completion of requisite Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities Interconnection Customer may request limited Interconnection Service at the discretion of Transmission Provider based upon an evaluation that will consider the results of available studies, which terms shall be memorialized in the Interconnection Service Agreement. Consistent with Tariff, Part VI, Subpart B, section 212.4, Interconnection Customer may execute the Interconnection Service Agreement, request dispute resolution or request that the Interconnection Service Agreement be filed unexecuted with the Commission. Transmission Provider shall determine, through available studies or additional studies as necessary, whether stability, short circuit, thermal, and/or voltage issues would arise if Interconnection Customer interconnects without modifications to the Generating Facility or the Transmission System. Transmission Provider shall determine whether any Interconnection Facilities, Network Upgrades, Local Upgrades, or system protection facilities that are necessary to meet the requirements of NERC, or any applicable Regional Entity for the interconnection of a new, modified and/or expanded Generating Facility are in place prior to the commencement of Interconnection Service from the Generating Facility. Where available studies indicate that such Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities that are required for the interconnection of a new, modified and/or expanded Generating Facility are not currently in place, Transmission Provider will perform a study, at the Interconnection Customer’s expense, to confirm the facilities that are required for Provisional Interconnection Service. The maximum permissible output of the Generating Facility shall be studied and updated annually and at the Interconnection Customer’s expense. The results will be communicated to the Interconnection Customer in writing upon completion of the study. Interconnection Customer assumes all risk and liabilities with respect to the Provisional Interconnection Service, including changes in output limits and Interconnection Facilities, Network Upgrades, Local Upgrades, and/or system protection facilities cost responsibilities.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!