Correcting Brightness Sample Clauses

Correcting Brightness. If the image looks too bright or too dark you can open the “Gradation Dialogue” from the tool bar. Use the midtone slider to correct the overall brightness of your image. Any correction that you perform can easily be undone by typ- ing “Command-Z” and redone by typing “Command-Z” again (“Crtl-Z” on a Windows PC, respectively). In fact, you can toggle between the two.
AutoNDA by SimpleDocs
Correcting Brightness. If the image looks too bright or too dark you can open the “Gradation Dialogue” from the tool bar. Use the midtone slider to correct the overall brightness of your image. Use the second slider to correct the contrast. Silders for for highlights, shadows and brightness which allow further cor- rections, should be carefully used. Wrong settings can immediately lead to loss of tonal range, hence. to loss of image details. Individual corrections can also be achieved by directly moving gradation points on the curve or inputting values into the input fileds for gradation points accordingly. Gradation curves can be saved as well as previously saved curves can be loaded here. Any correction that you perform can easily be undone by typing “Command-Z” and redone by typing “Command-Z” again (“Crtl-Z” on a Windows PC, respectively). In fact, you can toggle between the two.

Related to Correcting Brightness

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Interview Process Interviews will take place over a period of ninety (90) days. The interviews both of bargaining unit employees and of managers will be conducted jointly by Union/Industry members of the Technical Committee (or designates).

  • Glass Or Safety Glazing Material a. We cover:

  • Correction No corrections shall be made in the tender documents. Any corrections that are to be made shall be made by crossing the incorrect portion and writing the correct portions above with the initials of tenderer.

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Review Process A/E's Work Product will be reviewed by County under its applicable technical requirements and procedures, as follows:

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

Time is Money Join Law Insider Premium to draft better contracts faster.