Corrective Measure. The contractor shall repair any deficiencies in excess of the performance guideline.
Corrective Measure. The contractor will repair the door and the door latch as necessary to meet the performance guideline.
Corrective Measure. The contractor will take action as necessary to correct basement leaks, except where the cause is determined to result from the owner’s actions or negligence. CRAWL SPACE
Corrective Measure. The contractor will check the wiring for conformity to applicable local, state or approved national electrical code requirements. The contractor will repair wiring not conforming to code specifications.
Corrective Measure. The contractor will correct or replace and refinish defective doors to match existing doors as closely as practical. DISCUSSION: In bathroom or utility areas, exhaust fans or an open window must be used to minimize moisture to prevent warpage of door units. The contractor is not responsible for refinishing if doors were finished by the consumer.
Corrective Measure. None. Prevention of ice build-up on the roof is an owner maintenance item. 5-6 1 year Observation: Shingles have blown off. Performance Guideline: Shingles shall not blow off in winds of less than the manufacturer’s standards/ specifications.
Corrective Measure. The contractor will repair any defi- ciencies in excess of the performance guideline. If the wall is to remain unfinished according to the contract, and the wall meets building codes requirements as evidenced by passed inspections, then no corrective action is required.
Corrective Measure. The contractor will reinstall siding to comply with the performance guideline and will replace with new siding any siding damaged during removal.
Corrective Measure. The contractor will repair flooring in the affected areas to meet the performance guideline.
Corrective Measure. The contractor will repair the affected area to meet the performance guideline using a material designed to fill cracks in asphalt.