CUSTOMER ELECTRIC GENERATING SYSTEM. 1.1 Customer’s Net Metering License Application is hereby incorporated into this Agreement as Exhibit A. 1.2 Salem standard rates for this installation and service will apply, as defined in the City Electric Service Schedule, except as modified by this document or applicable state or federal law. 1.3 Customer has elected, in accordance with Salem City Municipal Code §11-1-090, to operate, at its own expense, a customer owned generation facility and net metering system, with a generating capacity of not more than twenty-five kilowatts (25 kW) aggregated at the service interconnection point, in parallel with Salem’s electrical system. This generating system is intended to offset either part or all of the Customer’s electrical requirements. 1.4 The electrical generating system used by the Customer shall be located on the Customer’s premises. It shall include all equipment necessary to meet applicable safety, power quality, and interconnection requirements. The electrical generating system shall comply with Salem Net Metering Standards and Code. 1.5 Salem shall have the sole authority to determine which interconnection requirements set forth herein (including Exhibits) are applicable to Customer’s proposed installation. 1.6 Any costs or expenses incurred by Salem due to modifications made to Salem’s existing electric power system as a result of the interconnection of Customer’s generating system shall be paid by the Customer. All costs must be paid in full prior to the connection to Salem’s electrical system. 1.7 Salem will be the owner of the renewable attributes of the electricity that is generated, to include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of Net Metering Agr Amend.wpd Page 1 2/28/2017 electricity from the customer owned-renewable generation and its displacement of conventional energy generation.
Appears in 2 contracts
Samples: Net Metering License Agreement, Net Metering License Agreement
CUSTOMER ELECTRIC GENERATING SYSTEM. 1.1 Customer’s Customer Net Metering License Application is hereby incorporated into this Agreement as Exhibit A.
1.2 Salem Provo City Power standard rates for this installation and service will apply, as defined in the City Electric Service Schedule, except as modified by this document or applicable state or federal law.
1.3 Customer has elected, in accordance with Salem City Municipal Code §11-1-090of Provo Ordinance 12.03.080, to operate, at its own expense, a customer owned generation facility and net metering system, with a generating capacity of not more than twenty-five kilowatts (25 kW) aggregated at the service interconnection point, in parallel with SalemProvo City Power’s electrical system. This generating system is intended to offset either part or all of the Customer’s electrical requirements.
1.4 The electrical generating system used by the Customer shall be located on the Customer’s premises. It shall include all equipment necessary to meet applicable safety, power quality, and interconnection requirements. The electrical generating system shall comply with Salem Provo City Power Net Metering Standards and Code.Standards
1.5 Salem Provo City Power shall have the sole authority to determine which interconnection requirements set forth herein (including Exhibits) are applicable to Customer’s proposed installation.
1.6 Any costs or expenses incurred by Salem Provo City Power due to modifications made to SalemProvo City Power’s existing electric power system as a result of the interconnection of Customer’s generating system shall be paid by the Customer. All costs must be paid in full prior to the connection to SalemProvo City Power’s electrical system.
1.7 Salem Provo City Power will be the owner of the renewable attributes of the electricity that is generated, to include any and all credits, certificates, benefits, environmental attributes, Net Metering License Agreement 8-13-09(clean) Page 2 12/1/2009 emissions reductions, offsets, and allowances, however entitled, attributable to the generation of Net Metering Agr Amend.wpd Page 1 2/28/2017 electricity from the customer owned-renewable generation and its displacement of conventional energy generation.
Appears in 2 contracts
Samples: Net Metering License Agreement, Net Metering License Agreement
CUSTOMER ELECTRIC GENERATING SYSTEM. 1.1 Customer’s Customer Net Metering License Application is hereby incorporated into this Agreement as Exhibit A.
1.2 Salem Provo City Power standard rates for this installation and service will apply, as defined in the City Electric Service Schedule, except as modified by this document or applicable state or federal law.
1.3 Customer has elected, in accordance with Salem City Municipal Code §11-1-090of Provo Ordinance 12.03.080, to operate, at its own expense, a customer owned generation facility and net metering system, with a generating capacity of not more than twenty-five kilowatts (25 kW) aggregated at the service interconnection point, in parallel with SalemProvo City Power’s electrical system. This generating system is intended to offset either part or all of the Customer’s electrical requirements.
1.4 The electrical generating system used by the Customer shall be located on the Customer’s premises. It shall include all equipment necessary to meet applicable safety, power quality, and interconnection requirements. The electrical generating system shall comply with Salem Provo City Power Net Metering Standards and CodeStandards.
1.5 Salem Provo City Power shall have the sole authority to determine which interconnection requirements set forth herein (including Exhibits) are applicable to Customer’s proposed installation.
1.6 Any costs or expenses incurred by Salem Provo City Power due to modifications made to SalemProvo City Power’s existing electric power system as a result of the interconnection of Customer’s generating system shall be paid by the Customer. All costs must be paid in full prior to the connection to SalemProvo City Power’s electrical system.
1.7 Salem Provo City Power will be the owner of the renewable attributes of the electricity that is generated, to include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of Net Metering Agr Amend.wpd Page 1 2/28/2017 electricity from the customer ownedcustomer-owned renewable generation and its displacement of conventional energy generation.
Appears in 2 contracts
Samples: Net Metering License Agreement, Net Metering License Agreement
CUSTOMER ELECTRIC GENERATING SYSTEM. 1.1 a. Customer’s Net Metering License Application is hereby incorporated into this Agreement as Exhibit A.
1.2 Salem b. City standard rates for this installation and service will apply, as defined in the City Electric Service Schedule, except as modified by this document or applicable state or federal law.
1.3 c. Customer has elected, in accordance with Salem City Spanish Fork Municipal Code §11-1-09013.08.030, to operate, at its own expense, a customer owned generation facility and net metering system, with a generating capacity of not more than twenty-five kilowatts (25 kW) aggregated at the service interconnection point, in parallel with SalemSpanish Fork City Power’s electrical system. This generating system is intended to offset offset either part or all of the Customer’s electrical requirements.
1.4 d. The electrical generating system used by the Customer shall be located on the Customer’s premises. It shall include all equipment necessary to meet applicable safety, power quality, and interconnection requirements. The electrical generating system shall comply with Salem City Net Metering Standards and Code.Standards
1.5 Salem e. City shall have the sole authority to determine which interconnection requirements set forth herein (including Exhibits) are applicable to Customer’s proposed installation.
1.6 f. Any costs or expenses incurred by Salem City due to modifications made to SalemCity’s existing electric power system as a result of the interconnection of Customer’s generating system shall be paid by the Customer. All costs must be paid in full prior to the connection to SalemCity’s electrical system.
1.7 Salem g. City will be the owner of the renewable attributes of the electricity that is generated, to include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsetsoffsets, and allowances, however entitled, attributable to the generation of Net Metering Agr Amend.wpd Page 1 2/28/2017 electricity from the customer owned-renewable generation and its displacement of conventional energy generation.renewable
Appears in 1 contract
Samples: Net Metering License Agreement
CUSTOMER ELECTRIC GENERATING SYSTEM. 1.1 Customer’s Net Metering License Application is hereby incorporated into this Agreement as Exhibit A.
1.2 Salem Ephraim City Power standard rates for this installation and service will apply, as defined in the City Electric Service Schedule, except as modified by this document or applicable state or federal law.
1.3 Customer has elected, in accordance with Salem City Municipal Code §11of Ephraim Ordinance 16-1-090, 02 to operate, at its own expense, a customer owned generation facility and net metering system, with a generating capacity of not more than twenty-five kilowatts (25 5 kW) aggregated at the service interconnection point, in parallel with SalemEphraim City Power’s electrical system. This generating system is intended to offset either part or all of the Customer’s electrical requirements.
1.4 The electrical generating system used by the Customer shall be located on the Customer’s premises. It shall include all equipment necessary to meet applicable safety, power quality, and interconnection requirements. The electrical generating system shall comply with Salem Ephraim City Power Net Metering Standards and Code.Standards
1.5 Salem Ephraim City Power shall have the sole authority to determine which interconnection requirements set forth herein (including Exhibits) are applicable to Customer’s proposed installation.
1.6 Any costs or expenses incurred by Salem Ephraim City Power due to modifications made to SalemEphraim City Power’s existing electric power system as a result of the interconnection of Customer’s generating system shall be paid by the Customer. All costs must be paid in full prior to the connection to SalemEphraim City Power’s electrical system.
1.7 Salem Ephraim City Power will be the owner of the renewable attributes of the electricity that is generated, to include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of Net Metering Agr Amend.wpd Page 1 2/28/2017 electricity from the customer owned-renewable generation and its displacement of conventional energy generation.
Appears in 1 contract
Samples: Net Metering License Agreement