Daily Cover of the Working Face - ADC Green Waste Sample Clauses

Daily Cover of the Working Face - ADC Green Waste. CDI Fines Contractor may utilize ADC green waste or ADC CDI Fines material for daily cover of the working face. This work includes: moving ADC Green Waste or ADC CDI fines material from the stockpile on site to the landfill working face; applying and compacting the ADC green waste or ADC CDI fines materials on the active face of the landfill. Material will be delivered by County’s on-site green waste and wood recycling contractor as close to the working face as practical and allowed by the condition of the access road. Contractor shall apply and compact the ADC Green Waste Material to a minimum compacted thickness of six (6) inches and average compacted thickness of less than or equal to twelve (12) inches. The layer shall be spread evenly, then tracked and compacted onto the surface of waste by making a minimum of two (2) passes with track-type dozer equipment as required in Section 4.17 (Contractor Provide Equipment). County may approve alternative equipment and methods. Handwork may be required to cover all exposed trash. ADC green waste may remain in-place for up to 21 days before it must either be covered by soil or another lift of waste. Contractor shall apply and compact the ADC CDI Material to a minimum compacted thickness of six (6) inches and average compacted thickness of less than eighteen (18) inches. The layer shall be spread evenly, then tracked and compacted onto the surface of waste by making a minimum of two (2) passes with track-type dozer equipment as required in Section 4.17 (Contractor Provide Equipment). County may approve alternative equipment and methods. Handwork may be required to cover all exposed trash. ADC CDI may remain in- place for up to 24 hours before it must either be covered by soil or another lift of waste. No separate compensation will be made for this work.
AutoNDA by SimpleDocs

Related to Daily Cover of the Working Face - ADC Green Waste

  • How Long Does Warranty Coverage Last? The warranty lasts for a period up to 5 YEARS after the instal- lation date. This warranty period does not continue after the unit is re- moved from the location where it was originally installed. The replacement of a part under this warranty does not extend the warranty period. In other words, Daikin warrants a replacement part only for the period remaining in the war- ranty term that commenced on the installation date. What Xxxx Xxxxxx Do To Correct Problems? Daikin will furnish a replacement part, without charge for the part only, to replace any part that is found to be defective due to workmanship or materials under normal use and mainte- xxxxx. Furnishing of the replacement part is Daikin’s only responsibility under this warranty. THE APPLICABLE REMEDIES DESCRIBED IN THIS SECTION ARE DAIKIN’S ONLY RESPONSIBILITIES, AND THE OWNER’S ONLY REMEDIES, FOR ANY BREACH OF THIS WARRANTY OR ANY IMPLIED WARRANTY. Part No. PWDCLAHTWZQE COMMERCIAL WARRANTY Models: ACNF, ARUF, ASPT, AWST, AWUF, AWUT, AMST, CAPF, CAPFA, CAPT, CAUF, CAUFA, CAPEA, CAPE, CHPF, CHPE, CSCF, CAPTA, CHPTA, CHPT, MBVC What Won’t Daikin Do To Correct Problems? Daikin will not pay for: • Labor, freight, or any other cost associated with the service, repair, or operation of the unit. • Electricity or fuel costs, or increases in electricity or fuel costs, for any reason, including additional or unusual use of supplemental electric heat. • Lodging or transportation charges. • Refrigerant. WHETHER ANY CLAIM IS BASED ON NEGLIGENCE OR OTH- ER TORT, BREACH OF WARRANTY OR OTHER BREACH OF CONTRACT, OR ANY OTHER THEORY, NEITHER DAIKIN NOR ANY OF ITS AFFILIATES SHALL IN ANY EVENT BE LIABLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES, INCLUDING BUT NOT LIMITED TO LOST PROFITS, LOSS OF USE OF A UNIT, EXTRA UTILITY EXPENSES, OR DAMAGES TO PROPERTY.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Drawings Submitted During the Contract Term Where required to develop maintain and deliver diagrams or other technical schematics regarding the scope of work, Contractor shall do so on an ongoing basis at no additional charge, and must, as a condition of payment, update drawings and plans during the Contract term to reflect additions, alterations, and deletions. Such drawings and diagrams shall be delivered to the Authorized User’s representative.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Cooling Off Period You may terminate this Contract with immediate effect at any time within the period of 14 days after the date this Contract is entered into without incurring any liability to DFMC.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!