Data Recording and Measurement Sample Clauses

Data Recording and Measurement. 1. GENCO will provide the necessary labour, material, instrumentation and controls to record observe and evaluate the test data and maintain the logs of all data taken. Where practical the data will be recorded in both hard copy and electronic form.
AutoNDA by SimpleDocs

Related to Data Recording and Measurement

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Data Encryption Contractor must encrypt all State data at rest and in transit, in compliance with FIPS Publication 140-2 or applicable law, regulation or rule, whichever is a higher standard. All encryption keys must be unique to State data. Contractor will secure and protect all encryption keys to State data. Encryption keys to State data will only be accessed by Contractor as necessary for performance of this Contract.

  • Authorized User Overview and Mini-Bid Process Project Based IT Consulting Services Contracts enable Authorized Users to use a competitive Mini-bid Process to acquire Services on an as-needed basis, for qualified IT Projects. Project Based IT Consulting Services may include, but will not be limited to projects requiring: analysis, data classification, design, development, testing, quality assurance, security and associated training for Information Technology based applications. See section 1.3 Out of Scope Work for a listing of projects expressly excluded from the scope of this Contract. An Authorized User Agreement for Project Based IT Consulting Services will be governed first by the terms and conditions specified in the OGS Centralized Contract and second by terms and conditions added to the Authorized User Statement of Work. Additional terms and conditions shall not conflict with or modify the terms and conditions of the OGS Centralized Contract. NYS Executive Agencies must adhere to all internal processes and approvals including, as required, approval from NYS Office of Information Technology Services. Other Authorized Users must adhere to their own internal processes and approvals. In accordance with Appendix B, section 28, Modification of Contract Terms, an Authorized User may add additional required terms and conditions to this Mini-Bid and resultant Authorized User Agreement only if such terms and conditions (1) are more favorable to the Authorized User and (2) do not conflict with or supersede the OGS Centralized Contract terms and conditions. Examples of additional terms and conditions include: • Expedited delivery timeframe; • Additional incentives, such as discount for expedited payment/Procurement Card use; and • Any additional requirements imposed by the funding source or Federal law.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Data Reporting 1. Maintain and adhere to data system software and encrypted portable computer device updates, and interface capability requirements for each computer located within the facility, and as specified in the Contract and required by County.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

Time is Money Join Law Insider Premium to draft better contracts faster.