Description of Hxxxxxxxx Substation Facilities Sample Clauses

Description of Hxxxxxxxx Substation Facilities. The Hxxxxxxxx Substation Facilities include all above ground 500kV structures, bus, and equipment and associated foundations starting at the 230kV side of the transformer high-side air break, 501H, to the extents of the station yard where the MPSN (Midpoint Substation) 1 and SMLK (Summer Lake) line terminals depart to the tap line segments. The major equipment included in the Hxxxxxxxx Substation Facilities consist of six 500kV breakers and one spare 500kV breaker (stored on location), seventeen 500kV airbreaks, one SMLK line reactor bank (three 1-phase units), and one shunt capacitor bank and associated barrier fence attached to bus #2. Also included in the Hxxxxxxxx Substation Facilities are 13 control, protection and line carrier panels, 3 intertie cabinets and their associated control cables from the panels to the yard equipment. The Hxxxxxxxx Substation Facilities also include all components associated with both tap segments for the MPSN 1 and SMLK line terminals extending and connecting to the existing Midpoint–Summer Lake Line. 1 Power Circuit Breaker, 550kV 4000Amp 205 1 Power Circuit Breaker, 550kV 4000Amp 205 1 Power Circuit Breaker, 550kV 4000Amp 205 1 Power Circuit Breaker, 550kV 4000Amp 205 1 Power Circuit Breaker, 550kV 2000Amp 206 1 Power Circuit Breaker, 550kV 2000Amp 204 1 Power Circuit Breaker, 550kV 2000Amp 204 10 Local Equipment Annunciator Units for Reactors and Breakers 1 Shunt Reactor, 317.5/550kV, 44.33 201-1 MVA 1 Shunt Reactor, 317.5/550kV, 44.33 MVA 201-1 1 Shunt Reactor, 317.5/550kV, 44.33 MVA 201-1 1 Shunt Capacitor, 550kV 220MVAR Expandable to 330MVAR 203 13 Switch, Motor Operated Airbreak, 500kV 4000A 208 3 Switch, Motor Operated Airbreak, 500kV 2000A 209-1 1 Switch, Motor Operated Airbreak w/ GND Switch, 500kV 2000A 209-2 12 Capacitor Voltage Transformer, 500kV 211 6 Capacitor Voltage Transformer, 500kV w/ Carrier Accessories 212 6 Line Trap, 500kV 3000A 214-1 6 Line Tuner, Single Phase Uxxxx 000-0 00 Xxxxx Xxxxxxxx, 318kV MCOV 215 6 Surge Arrestor, 144kV MCOV 238 138 Insulator, Station Post, 500kV 1800BIL 217 48 Insulator, Station Post, 500kV 1800BIL 218 153 Insulator, Suspension, Polymer 500kV Class 220 2 Steel Structure, 500kV Line-Deadend A-Frame Structure 100-1 4 Steel Structure, 500kV Line-Deadend A-Frame Structure 100-2 51 Steel Structure, 500kV 3-ph Airbreak Support 106-1 12 Steel Structure, 500kV CCVT Structure 107-1 6 Steel Structure, 500kV Line Trap Structure 107-2 9 Steel Structure, 500kV Surge Arrestor Structure...
AutoNDA by SimpleDocs

Related to Description of Hxxxxxxxx Substation Facilities

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • LOCATION AND DESCRIPTION OF THE PROPERTY The subject property is a single-storey terraced house bearing the postal address of Xx. 00, Xxxxxx 00/XX0, Xxxxxx Xxxxx Xxxxxxx, 00000 Xxxxxxx Xxxxx, Xxxxxx. The subject property will be sold on an “as is where is basis” and subject to a reserve price of RM310,000.00 (RINGGIT MALAYSIA THREE HUNDRED TEN THOUSAND ONLY) and subject to the Conditions of Sale and by way of an Assignment from the above Assignee/Bank subject to the consent being obtained by the Purchaser from the Developer and other relevant authorities if any, including all terms, conditions, stipulations and covenants which were and may be imposed by the Developer and the relevant authorities. Any arrears of quit rent, assessments and service or maintenance charges which may be lawfully due to any relevant authority or the Developer up to the date of auction sale of the property shall be paid out of the purchase money upon receipt of full purchase price. All other fees, costs and charges relating to the transfer and assignment of the property shall be borne by the successful Purchaser. Online bidders are further subject to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx. All intending bidders are required to deposit 10% of the fixed reserve price for the said property by Bank Draft or Cashier’s Order in favour of UOBM for KRISHNAMAL A/P MURLIGIAH & XXXXXXXXXXX A/L XXXXXXX or remit the same through online banking transfer, one (1) working day before auction date. The balance of the purchase money shall be paid by the Purchaser within one hundred and twenty (120) days from the date of auction sale to UNITED OVERSEAS BANK (MALAYSIA) BHD via Real Time Electronics Transfer of Funds and Securities (XXXXXX). For online bidders please refer to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx on the manner of payment of the deposit. FOR FURTHER PARTICULARS, please contact M/S HOE & MOIRA, of Xxxxx 000X (Xxxxx), 0xx Xxxxx, Xxxxx Xxxxxx Xxxxxx, Xxxxxxxxxx Xxxx, 00000 Xxxxxx, Xxxxxxxx. (Ref:H&M/MT/Z4P/CB23/16) Tel.: 00-000 0000, Fax: 00-000 0000) the Assignee herein or the undermentioned Auctioneer. Suite C-20-3A, Level 20, Block C, Megan Avenue II, / XXXXX XXXXX BIN XXXXXX 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur (Licensed Auctioneers) Tel No.: 00-0000 0000 Fax No.: 00-0000 0000 Our Ref: LIAN/UOB1035HM Website: xxx.xxxxxxxxxxxxxxxx.xxx E-mail: xxxx@xxxxxxxxxxxxxxxx.xxx [berkuatkuasa dari 1.11.2022, perniagaan perbankan pengguna (consumer banking business) CITIBANK BERHAD (No. Syarikat: 199401011410 (297089-M) telah dipindahmilik kepada xxx diletakhakkan kepada UOB di bawah Perintah Letakhak bertarikh 12.10.2022 melalui Mahkamah Tinggi Kuala Lumpur Saman Pemula No. WA-24NCC-903-09/2022] Dalam menjalankan xxx xxx kuasa xxxx telah diberikan kepada Pihak Pemegang Serahhak/Bank dibawah Perjanjian Kemudahan, Penyerahanhak xxx Surat Kuasa Wakil kesemuanya Bertarikh 09hb Julai, 2001 diantara Pihak Penyerahhak, Pihak Pelanggan xxx Pihak Pemegang Serahhak/Bank yang diperbuat dalam perkara diatas, adalah dengan ini diisytiharkan bahawa Pihak Pemegang Serahhak/Bank tersebut dengan bantuan Pelelong yang tersebut dibawah.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • General Description of Facilities Subject to and upon the terms and conditions herein set forth, (i) the Lenders hereby establish in favor of the Borrower a revolving credit facility pursuant to which each Lender severally agrees (to the extent of such Lender’s Revolving Commitment) to make Revolving Loans to the Borrower in accordance with Section 2.2, (ii) the Issuing Bank may issue Letters of Credit in accordance with Section 2.22, (iii) the Swingline Lender may make Swingline Loans in accordance with Section 2.4, (iv) each Lender agrees to purchase a participation interest in the Letters of Credit and the Swingline Loans pursuant to the terms and conditions hereof; provided, that in no event shall the aggregate principal amount of all outstanding Revolving Loans, Swingline Loans and outstanding LC Exposure exceed the Aggregate Revolving Commitments in effect from time to time; and (v) each Lender severally agrees to make a Term Loan to the Borrower on the Closing Date in a principal amount not exceeding such Lender’s Term Loan Commitment.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.