Common use of Design Limits Clause in Contracts

Design Limits. 7.1 The Company shall install such equipment that shall allow the Company to supply to generate and supply power to the JPS Grid in accordance with the applicable power factor parameters set out in the Generation Code. 7.2 The supply shall be able to operate at frequencies between 48 and 51 hertz, provided that the Company has the right to separate from the JPS Grid, without any liability to JPS if the Company is required to furnish power to the JPS Grid operating at 48 hertz for one second. 7.3 JPS shall use its best efforts to maintain the voltage at the Interconnection Point at [Rated] kV, +/-5 % of the transmission system during normal conditions and +/-10% of the transmission system during abnormal conditions. After 15 seconds of grid voltage exceeding the +/- 5% tolerance of the generator bus and +/-10% of the transmission system, the Company will trip offline. The Company shall be responsible for maintaining a tolerance of +/-5% of the generator bus. 7.4 The Complex shall be designed with the capability for Fault Ride Through (FRT) for short circuits on the JPS Grid up to 140ms in duration. The Facility shall remain transiently stable and connected to the JPS Grid without tripping of the Facility. 7.5 The Company shall advise JPS of any operating constraints and limits, which may from time to time, apply to the Facility.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Design Limits. 7.1 The Company shall install such equipment that shall allow the Company to supply to generate and supply power to the JPS Grid in accordance with the applicable power factor parameters set out in the Generation Code. 7.2 The supply shall be able to operate at frequencies between 48 and 51 hertz, provided that the Company has the right to separate from the JPS Grid, without any liability to JPS if the Company is required to furnish power to the JPS Grid operating at 48 hertz for one second. 7.3 JPS shall use its best efforts to maintain the voltage at the Interconnection Point at [Rated] kV, +/-5 /- 5% of the transmission system during normal conditions and +/-10/- 10% of the transmission system during abnormal conditions. After 15 seconds of grid voltage exceeding the +/- 5% tolerance of the generator bus and +/-10% of the transmission system, the Company will trip offline. The Company shall be responsible for maintaining a tolerance of +/-5/- 5% of the generator bus. 7.4 The Complex shall be designed with the capability for Fault Ride Through (FRT) for short circuits on the JPS Grid up to 140ms 140 ms in duration. The Facility shall remain transiently stable and connected to the JPS Grid without tripping of the Facility. 7.5 The Company shall advise JPS of any operating constraints and limits, which may from time to time-to-time, apply to the Facility.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!